Done the hanger for the front grey water tank need a middle brace still. That will come after the registration.

The brake lines are done and the brake locks are in place.

Both steps are done

and the trailer now stands on it’s own feet at normal ride height. Hardly any air in the bags at this stage with so little weight on them right now.

 

 

 

Lots Of Bolts

By |June 10th, 2015|CHASSIS BUILD|0 Comments

A lot of bolts went into their place today. I finally received the washers yesterday after 6 days (within Perth). It took 7 days for some parts from the US, they also arrived yesterday.
With the washers now the remaining bolts could be fitted.
The coupling mount is now completely fixed.

So are the suspension hangers now. The counter plate is shown from the top with the rubber membrane around and pressed between cross members. Nothing is going to move or rattle here. The bolts sit in Nylon sleeves and all bolts are press
fitted into the sleeves.

I also started to fit the […]

Brake Lock

By |June 8th, 2015|CHASSIS BUILD|0 Comments

The shocks are all done and the running gear and brakes are all mounted.
Brake lines are bend and the first wheels are on.

The flexible brake hoses are all in and secured and the steel lines are bent. I have identified the position for my brake locks. Although I had that in the model I did not have the brake lines made including the lock. I first wanted to see where I end up. Now the brake lines are bent and I could confirm the location.

The hydraulic brake lock sits after the ABS controller just before the wheel. The lock is a […]

Shocks

By |June 6th, 2015|CHASSIS BUILD|0 Comments

Busy again today. Tacked the outriggers on the lower chassis for the floor support and under floor storage hangers.
Will finish welding them tomorrow.

Fitted the shocks now in position. I use two boots for each shock .. not so much that I am worried about the body of the shock, it is the plastic adjuster and the bottom end which needs protection.

Below is the image of the adjuster.

The bottom boot slips over the adjuster and it is mounted behind the shock in driving direction for additional protection.
All precautions for gravel roads. The trailing arms are the only areas which are exposed, […]

Cable Supports

By |June 5th, 2015|CHASSIS BUILD|0 Comments

Done lots of small tasks, producing brackets and mounting cables and brake lines.
Very time consuming, finished the main brake lines from the main actuator to the
Abs actuator and fitted the flexible brake hoses at each wheel and the ABS sensor
cables.

Above angles are used to mount the control and power cables for the legs at some part of the chassis.

Fitted the brackets to hold the ABS sensor line in place and avoid rubbing on the wheel. Fitted all the little brackets which we made earlier. Had a bit help from a German backpacker doing a few things for me right now.

Securing […]

Running Gear Mounted

By |June 3rd, 2015|CHASSIS BUILD|0 Comments

Today I have installed the running gear on the right side of the trailer and designed and prepared a couple of mounting brackets for brake lines and ABS cable. Done other bits and pieces including the mounting bracket for the ABS actuator.

When I have fitted the mounting brackets for the brake lines I will then connect the brakes to the ABS actuator.

As I go along I document each step in my Installation WIKI with images .. better than descriptions ..

I have uploaded a sample page of today’s work. For each component I will document how it is installed and/or […]

Wiring Bigfoot

By |May 31st, 2015|CHASSIS BUILD|0 Comments

Still working on the wiring for the legs.

As I said earlier, the waterproof connectors take time and I accept nothing less than 100% when it comes to crimping the contacts. I just recently repaired some electrical stuff on an Avan and connector fitting was appalling. Insulation to short and not reaching into the housing of the plug, crimp connections only on the copper strands, not on the insulation, electrical tape used instead of heat shrink, etc. The current owner did not do it, I am certain. Could have been the previous owner though.

The harness for the levelling system was far too long and the […]

Motorbike Carrier

By |May 30th, 2015|CHASSIS BUILD|0 Comments

Yesterday I hooked up the van for the first time to the truck and also fitted the motorbike on the back of the truck to see if everything works out. The front legs are not on yet and the chassis is a bit higher than ride height. We finished all welding on the thick stuff, completely done and use one 7kg role of wire so far.

Today I did put all legs back on and wired the electrical connections. Takes some time because I had to cut the harness provided (just way too long) and fit connectors. Waterproof connectors take time to fit, […]

Truck Brakes Again

By |May 30th, 2015|CHASSIS BUILD|0 Comments

Last Thursday I finished the brakes on my truck all around. Put the new hub seals on the rears an all new rotors are fitted. Below image shows the front. I am not really keen with drilled and  slotted rotors but I wanted some galvanised ones, not just the regular steel, and these still came at a reasonable price including metallised performance brake pads. Will use the same on the van.

Because I changed the ball joint I had the torsion bar off and along the way putting it back together I did bend a C-clamp. I think I should reduce […]

Coupling Receiver

By |May 26th, 2015|CHASSIS BUILD|0 Comments

Not bolted on yet, will do that tomorrow. I did remove it twice until I had the membranes fitted properly and everything was where it is supposed to be.

Mud guards are almost finished, will do that tomorrow as well.

Truck Brakes

By |May 24th, 2015|CHASSIS BUILD|0 Comments

Today was service day for the truck.
Installing my anti gravity engine – floating 30cm over ground .. would’nt that be nice .. and all running on water vapour.

Done the left side ball joints and stabiliser, (did the right side a few weeks ago), rear brakes, new rotors all round, new pads, new park brake pads, new front flexible brake hoses. Did not finish the rear – need new axle seals to make sure they are real tight. The drive shaft and bearings run in oil from the diff, so no grease or packing, just making sure the seal is real […]

Chassis On It’s Feet

By |May 22nd, 2015|CHASSIS BUILD|0 Comments

Here it is, out of the shed, on its feet with the neck fitted.

Some detail pics: The powder coater ended up making the stuff black although I told him I wanted a bright colour. Anyway it was a lot cheaper that way, and one does not see the chips that much. The coupling mount in the front however is a nice bright safety yellow.
Will fit that tomorrow.

Side view of one trailing arm, one shock mounted only and the limiter strap in place.

Image of the airbag plate from the top with the temporary air lines. Currently in load sharing configuration […]

Bigfoot And Battery

By |May 21st, 2015|CHASSIS BUILD|0 Comments

Another day gone …

Half the day was shopping.
Battery – picked up at ev works
Brake lines, total of 16m lines and fittings for the ABS systems.
Bolts and Nuts, threaded rods for the axle sleeves, air fittings and hose for the air bags. Just temporary stuff until I fit the air engine with the levelling system.
Mounted the battery. Did not do the case yet. Just the mounting platform.

Finished temporary install of the Bigfoot levelling system. Temporary because the cables are not yet properly routed. Everything else is final. The cables are way too long. Made for US 40 footers with the panel […]

Brake Actuator

By |May 20th, 2015|CHASSIS BUILD|0 Comments

Lots of things happening … including a car accident .. some puppet had to push 4 cars into each other and I was the front one. Had our little city car and the poor thing is now in car hospital. I am ok, no problem, just very annoying. When do they learn to drive in Australia?

Anyway .. back to the subject ..

The electric over hydraulic brake actuator is mounted in the front of the lower chassis.

Mounts for the rear holding tanks are in, the middle section between the two tanks is not yet done.
All the floor supports are done […]

Main Chassis Frame Welding Almost Finished

By |May 18th, 2015|CHASSIS BUILD|0 Comments

Done some more welding today. The rest of the main chassis welds were finished and the first welds done for the thinner alu, like the floor supports and some tank hangers.
Have fitted the first leg as a test.

All the steel parts are at the powder coaters and I expect them to be ready by Thursday. During the week I have to organise lots of little things. Next Friday we plan to put the wheels on and pull the lower chassis out of the shed to mount the neck.

I have some 6mm channel in 6082 which I will cut to an angle to […]

Mounting Suspension Hangers

By |May 16th, 2015|CHASSIS BUILD|0 Comments

Two very busy days, yesterday and today.
Done lots. Finished all alu welding on underside and all steel welding.
First time I had all suspension hangers mounted to fit the trailing arms.

Above shows all 4 trailing arms mounted for alignment and tacking on the blocks.

Above shows a wheel from behind. Have sorted out the routing of the flexible brake line and the bracket mount on the trailing arm to securely fix the brake line. Made little plates and welded them onto the trailing arm.

Finished the bumper mounts. Sacrificial bumper and mounts. If someone bumps into us it will take some of the […]

DMX Controller

By |May 10th, 2015|COMPONENT BUILD|0 Comments

Done some clean up today, sanding sharp corners, cleaning welds.
I have also temporarily fitted the brake line (flexible) to one trailing arm to check how to route the lines. I need a couple of tabs on the trailing arm to fix the brake line brackets, which are connected to the flexible hose. I am using the same front end hoses as on my truck.

Checked the cable length for the hydraulic actuator and it’s position.

Later I built another building block of the control system. See image above.

This is a DMX junction box with 3 DMX clients, 3 channels each, to control […]

Coupling Brace

By |May 9th, 2015|CHASSIS BUILD|0 Comments

These 4 and 4 more were the last bits I had from cutting the 5 9.9m RHS main rail sections. They are now the rear mounts for the bumper and the the other 4 are gussets for the cross member which holds the angles from the coupling braces. I have nothing left from those long sections, just a few shavings.

 Fitted the coupling braces to day and tacked them. The last bit of steel welding. Tomorrow I will continue cleaning the parts from splatter, like I started today to get them ready for powder coating. Pretty heavy now that coupling bit. […]

Coupling Welding

By |May 8th, 2015|CHASSIS BUILD|0 Comments

Another busy day over.
My laser cutter did let me down a bit and did not finish a couple of parts I wanted to use this weekend.
Anyway, my mate was here again and we almost finished all the steel works. Trailing arms are done, the shock mounts on the trailing arms as well as on the chassis, two of the airbag platforms, waiting for a couple of parts for the other 2 airbag platforms to finish.

Above is a pic of the outer coupling tube. The actual coupling slides into this tube. Obviously this is upside down since the neck still lays on the […]

Truck Coupling

By |May 6th, 2015|COMPONENTS & MATERIALS|0 Comments

Today I finally got around to install my goose neck coupling on the truck.
I got a good workout without a hoist. 50 times out under the truck and back.
The exhaust had to go first to make some room and the the install was not that bad.
Above is the hole.

This image shows how I pulled the center section of the coupling up against the truck bed from below. That made installing the bolts a lot easier.