By |July 28th, 2015|COMPONENT BUILD|0 Comments

Rainy day in the office – done work on the website project.
Tonight I finished a 12V junction box for more processor box connections. It also doubles as CanBus junction box, at least for the moment. One can see the terminator plugged into the out connector.

I use standard 4 pole connectors for this, all the same despite the fact that I only  use two pins. The proper way would have been to use different pins for the 12V and the CanBus, but I decided to use the same. This makes testing easier but one has to be careful which plug goes where. […]

Tank Inspection Lids

By |July 27th, 2015|CHASSIS BUILD|0 Comments

Next step was to try the inspection lids I have for the water tanks. I need these to fit the tank sensors. This is the price I pay for the luxury of continuous tank level readings and not just 3 or 4 steps. I could have done without the lid but the the tank sender does not get fastened from the inside of the tank and I don’t like that idea. Although the tank sender fitted very tight into the 35mm hole, it is just better to have it properly fitted with it’s designated nut from inside. Also the lids […]

Air And Pumps

By |July 27th, 2015|CHASSIS BUILD|0 Comments

Busy day today.
Tomorrow we expect rain early so I tried to get as much done today as I could without stress.

Fitted the air tank .. stainless steel pipes welded together. With a stainless steel strap.
Two images show the tank from above (top image) and below.

Fitted the small compressor. Image below shows the compressor but the wrong way. Later image shows in correct position.
This is only a small one for the air engine and can alo be used to air the tyres, however I have a bigger compressor on the truck for pumping up the 6 tyres after a sand […]

DMX-Manual Box

By |July 26th, 2015|COMPONENT BUILD|0 Comments

Tonight I have finished another control box. This is a combination of DMX bus for light control and RF remote dimmers for manual switching. This box allows both manual and central control of the monochrome strip lights connected to the box.
Three channels are combined in one box for 3 separate light circuits of monochrome strip lights.

More and more different types of boxes are getting to the prototype stage. One of each kind for final testing before I make the quantity required for each type of box.

 

More Underfloor Work

By |July 26th, 2015|CHASSIS BUILD|0 Comments

Done a few things again outside.
The covers for the pump cases of the levelling system are on. I did cut the rest of the floor capping to finish everything tomorrow before the rain comes again on Tuesday. Wednesday is weigh bridge day.

The air engine is placed now on the chassis, no airlines yet connected though. This will come after registration. At the moment it is a simple load sharing manually controlled airbag suspension. This will change before I finally glue the floor. It is easier to finish the under floor installation that way.

Same applies to the plumbing of the tanks. Worked […]

Trailer Cable

By |July 24th, 2015|CHASSIS BUILD|0 Comments

Today I finally mounted the Anderson plug in the tub to connect power to the trailer battery.

The Anderson is rather primitive for that application since it does not contain any mechanism to clamp the insulation of the cable and all the weight and pull of the cable is hanging on the crimp contacts.

Not a great solution in general and not really good in my case. I thought about those 3 phase plugs with screw ring, but they are just too bulky. So I made my own clamp with “quick release”. not crash hot but it does work .. loosen […]

Component Network

By |July 24th, 2015|COMPONENT BUILD|0 Comments

This is how the components will be connected.

The one in the foreground is still in the making, the others are finished.
The Ethernet gateway connected to the DMX controller and that connected to a DMX hub and all supplied from a 12V power hub. This is how the system will be built .. all little building blocks with different functions and everything connected with straight cables.

This part of the network is working and all the boxes will get a shake and rattle test before they go into the van. I will only have very limited wiring to do at the […]

Tank Installation

By |July 23rd, 2015|CHASSIS BUILD|0 Comments

Next chapter for tank installation.

The image above shows the tank bracket brace mounted underneath the cross member. The tank brackets are bolted to that brace and it presses against the cross member and fixes all brackets in position.

The image below shows the lower brace for additional support of the brackets but more importantly as a jamb for the tank on one side, the other side has also one.

Below image shows the tank pressed into the location between the two jambs. I will have to remove it again to fit the valves, but for now I just wanted to make everything […]

First Tow

By |July 23rd, 2015|CHASSIS BUILD|0 Comments

This morning I hooked up the trailer and towed it. After 10 meters it fell apart .. just kidding I had the floor off and a few pieces laying on it and with some brake attempts I threw them off.

Absolutely awesome brakes, I only done walking speed and then pulled the handle on the brake controller to 100% and bang the whole rig was standing almost instantly.. absolutely awesome brakes. I hope nobody is tailgating me when I really have to slam on the brakes. He/she will sit in our lounge room then and  has a big bill […]

Component Cables

By |July 23rd, 2015|COMPONENT BUILD|0 Comments

Have cleaned up my electronic desk and prepared for integration test and mass production. I still have a few components to finalise but will start doing the system testing.

Image shows the Ethernet/Can gateway, the DMX processors and a DMX control box with the properCan bus cable.

I still have to make a few cables for the test.

I also have prepared the material (boards, boxes, plugs etc) for the mass production of the network components.

First are the tank sender hubs, valve control boxes and tank processor boxes to go under the floor when I finish the tank installation. I still wait for […]

Tank Mounts

By |July 22nd, 2015|CHASSIS BUILD|0 Comments

Worked a few hours on the tank brackets and fixings. I removed another floor panel at the rear for easier access. For now I can still work from the top which makes it a bit easier.

I do the center tanks next and the mounting frame will be done in a way that
I can also fix the underbelly cover and sides for the center tanks to it.  The center tanks are between the wheel and I cannot do a full cover across the full width of the chassis, I have to box in the center tank section and leave the trailing arms out.

Further […]

Tank Sender Hub

By |July 21st, 2015|COMPONENT BUILD|0 Comments

Finished a tank sender hub and it’s documentation in my development web. Decided to use only 4 per hub. That has to do with location and number of IOs of the processor and plugs.

The hub is fairly simple, it just provides connectors for 4 tank senders and the signal wire of the sender is connected to the 7 pin plug which connects to the processor.

I also have another one wire connector which allows to connect a one wire hub for temperature sensors.

Next is the valve and sender processing unit.

 

Plumbing

By |July 20th, 2015|CHASSIS BUILD|0 Comments

Next subject is tank related.
Today I was researching a bit more on pipes, fittings etc.

I have motorised ball valves for inlet and outlet of each tank. I want to make the inlet hoses 25mm for max possible flow although I may not need that too often really when we make the water through the desalinator, nevertheless I use that diameter because I have a few meters of hose I can use for the fresh water tanks. The tank inlet is 20mm.

For the drinking water I will use 19mm because foodgrade hose in 25mm is just too expensive and the […]

Tank Mounts

By |July 20th, 2015|CHASSIS BUILD|0 Comments

Today I had a few hours again outside.
I started to do all the tank mounts ..
the brackets were laser cut and bent and now I need to fit them onto the chassis that nothing moves.
The idea is that everything can be removed from underneath and fitted again if required. So welding is not going to happen because it needs to be removable.

The next best thing is to use rivnuts. Welding, rivnuts, glue, pop rivets and cable ties are the only fastening means I am going to use.
With most if not all caravans the doors, windows, baggage doors and other […]

DirecLink NE

By |July 19th, 2015|CHASSIS BUILD|0 Comments

Half a day today outside, raining again now a bit – on and off.
I have to do some other stuff for the rest of the day. This commercial project I am managing takes a bit more time off my schedule, so did the rain. At the moment I have around 4 weeks delay with my van, but that will not be the end at this stage. I still have to finish the underfloor frames before I can go to QLD but I am not stressing about that.. if it takes a few months longer it is not a drama […]

ABS Leak Fix

By |July 18th, 2015|CHASSIS BUILD|0 Comments

Had an answer from Tuson. Not very satisfactory though ..
I want to see a manufacturer or supplier not trying to shift the blame for something not working as the first part of a response.
How about just looking at the facts and what was said. It is so annoying that people cannot listen and always assume that one does not know what one talks about. Obviously there must be too many idiots they deal with to develop such an attitude.

They simply did not believe that their fittings are leaking. They also did not believe that they all were leaking and […]

Ethernet Gateway

By |July 18th, 2015|COMPONENT BUILD|0 Comments

I have finished another processor box.
This is the Ethernet / Can bus gateway. The central Linux systems talks to all the local processors and this unit converts the Ethernet messages to can bus messages to the relevant processor.
I have decided not to connect any other sensors or input / output signals, but purely let this work as a gateway or translator if you prefer that term. I have two of these, one for the left side of the van and one for the right side. I can connect the two local can buses and drive it from one gateway […]

ABS Leak

By |July 17th, 2015|CHASSIS BUILD|0 Comments

Have not posted for a while.
Lots of things to do and not just for the van.
A few more bits and pieces arrived, my Ethernet panel connectors, the water proof round panel connectors and a few other things. I now can finish my CAN/Ethernet gateway units and the valve controllers etc.

All the lights are connected and working and I rewired the trailer connectors on my truck with a new socket in the front of tub, closer to the coupling. I also have finished the wiring for the brake controller.

The VIN number is stamped on the chassis and I started to […]

Battery Monitor

By |July 12th, 2015|COMPONENT BUILD|0 Comments

Today I have finished all the lights. Connected everything, just minimum required, side markers, front markers, tail lights, number plate light.

The lights, the levelling system ,the brake controller and ABS controller, brake away switch and battery connection and the brake lines used almost 100m split tube. I have not yet hooked up the hydraulic brake locks but have fitted the Cat5 cables for the cameras.

Tomorrow I will do the brake controller and the new trailer socket on the truck. I still have to put a 12V charge cable in, wanted to buy some 8B&S cable (30m roll), no stock […]

Suzi Coil Cable

By |July 9th, 2015|CHASSIS BUILD|0 Comments

Was great weather again today.
Done some more wiring. The trailer cable connector, brake away switch and the electric over hydraulic actuator.
Above image shows the trailer cable with the 7 pin connector. I use the large metal ones, not the tiny plastic stuff which would not hold the heavy suzicoil. I have two more suzicoils, one for power 12V for the brakes and the trailer battery and one 15pin coil for all the remote control connections.

Tomorrow I have another lengthy business meeting in the morning, but I should be able to finish all wiring in the afternoon.