0414 740 669

GMD

About GMD

This author has not yet filled in any details.
So far GMD has created 330 blog entries.

On The Way Home

By |December 11th, 2015|BODY BUILD, BUILD|0 Comments

Exactly two weeks after I arrived in Yandina I left early in the morning.

I stayed again In Peterborough and also Cobar at the same places but this time I only needed 5 days. I was home Wednesday evening. Needed another couple of tyres in the front since the alignment was still off and the old tyres did not like it that much.

Everything else was fine.

On the Nullarbor I needed around 17l/h and the trip average on the way home was around 18.5l/h with 90-95kmh most of the time. Occasionally I was a bit faster especially towards the end on […]

Getting Ready For Home

By |December 9th, 2015|BODY BUILD|0 Comments

I started taping up all the gaps to keep the dust out on the trip home.

The top image shows the taped panel without the rear wall and ramp.

 

 

We have still done a fair bit of work inside the van. Glassed in the roof edges and quite a few more edges. Fitted the rear wall and Shaun made the ramp, which we taped and fixed with a couple of ratchet straps.

 

 

The image above shows the rig ready for the trip. This was taken in front of my accommodation.

Interior And Fender Skirts

By |December 9th, 2015|BODY BUILD|0 Comments

Fitted some of the inside walls to stabilise the roof. The fridge wall and another short wall opposite of the fridge. The corners are stiffened with alu angle.

Finished the wheel wells from inside. They are fairly low and will be inside cabinets. Nothing visible from the inside once finished.

The cut outs for the fender skirts were perfectly positioned. After mounting the wheel again I fitted the fender skirts. Just glued on after a bit of trimming.

 

 

Looks very nice. Like made for it, although the skirts are from an American motorhome. Had the coming with […]

Roof Installation

By |December 9th, 2015|BUILD|0 Comments

The front section of the roof is curved. In order to bend the panel to follow the curve of the side panels we made cuts every 15mm on the inside of the panel.

 

It took 8 people to put the roof panels in place and glue them onto the side panels. The red tape is holding the panels in place until the glue cures. The lower end of the panel is clamped to the chassis.

The roof consist of 3 sections which are joined with alu T-sections from above and glassed over inside. This was the easiest way to […]

Panel Installation

By |December 9th, 2015|BODY BUILD|0 Comments

With the chassis low and right next to the router it was reasonably easy to lift the panel into position. We started with the left panel, which was the other side of the router and the second panel only needed standing up from the router bed straight into position.

Both panels are hanging on the lifts and get glued to the chassis frame.

 

 

Cutting the panels

By |December 9th, 2015|BODY BUILD|0 Comments

Since I had everything in CAD it was fairly easy to transfer the files for the cut outs to the software Vanglass uses for the router. The cut outs stay attached at a few stops for stability of the panel during cutting and it is also a good concept to leave everything in for the way home. I only needed to tape up the gaps.

The large panels needed about an hour and a half to be cut.

 

 

The side panels had a rebate at the top and front for better and stronger connection to the roof and […]

Preparing for the panels

By |December 9th, 2015|BODY BUILD|0 Comments

The plan was to mount the body in the factory because the panels are way too big to be shipped and it would be a pain without the proper tools and more so without the experience of the guys at Vanglass.

Unlike the US vans this one is not as high, still the panel is 3m high and over 11m long. Than van is 2.8m at its highest point and we needed all the height of the lifting gear to get the panels on.

The first thing in the factory was to remove the wheels and drop it down as low […]

New Tyres

By |December 8th, 2015|BODY BUILD|0 Comments

 

The Nullarbor on 2 trailer wheels was no problem. The Duramax ticked over nicely, hardly working with a light tail wind. At 100kph the engine revs at 1600 and I did not even use tow mode. Form Madura to Ceduna I used under 14l/100km. In Ceduna I mounted the new tyres on the trailer and went on to Peterborough where I spent the night.

A nice coffee shop in the old cinema makes an interesting place for a break.

 

 

After Peterborough the roads got worse and worse. Past Broken Hill and the rest on NSW was atrocious. I was happy to […]

Burning Rubber

By |December 8th, 2015|BODY BUILD|0 Comments

The trip over to QLD started ok until I reached the Nullarbor with an outside temperature of 50 degrees. I had different tyres on the truck and the trailer, old tyres I have to admit. I did not want to ruin my new set of 12 because I knew that the alignment of the front of my truck was off and that the tyres would not last much more than the trip. I thought the trailer tyres, also an old set, might last the trip, however it was not to be. Just past Madura, actually before the Nullarbor on […]

Ready To Go

By |October 16th, 2015|BODY BUILD|0 Comments

All packed up. Antennas and radios are back on and in the truck. I had the HF antenna removed when I needed to get on a friends hoist and had not put it back. Now its worth for the trip. Can do some DX calls from the Nullabor plain.

I also have the UHF/VHF radio back in again with the GPS for the APRS system. The 2m whip is on the left in the picture. The whip on the right is the long whip which can go on top of the HF antenna instead of the short whip with the […]

Ready For The Body

By |October 14th, 2015|CHASSIS BUILD|0 Comments

The last few days I finished the floor and prepared the chassis for the trip to QLD. I still had a very small leak in the airline around the load share valve, but it is now fixed. I also connected a few more cables to the load share valves and the brake locks.

Shaun was so kind to organise the glue for me. Sausages of 600g with KD Bond. Of course a German product for the Teutanic.

I used an air gun to apply the glue. For the whole floor I used 13 of the sausages, which makes another 7+ kg.

The […]

BMS mounted in box

By |October 7th, 2015|COMPONENT BUILD|0 Comments

Today I also mounted the components of the BMS in a new box. I needed something bigger than the waterproof boxes I am using for the other components. It is still tight, but I did fit everything. I decided not to integrate the current sensors for the load and charge into the BMS although the Arduino mega has enough IO and programming space. I prefer this to be a separate node in the network.

The components are all in the box now. Next step is to prepare the front and rear panels of the box for the plugs to connect to […]

Load Share Air Line

By |October 7th, 2015|CHASSIS BUILD|0 Comments

Today I connected the load share valve for the air line between the two airbags on each side. After it was done and working I tested the suspension and timed the pressure equalisation between the bags and discovered that it was simply not sufficient. The valves I had used restricted the flow too much and so did the 3/8 plastic tube. Not good.

The load share between the bags is a valuable feature especially on rough roads. I also want to study the suspension characteristics with and without load sharing and in order to do that I need to make […]

Measuring

By |October 7th, 2015|BODY BUILD|0 Comments

This is the first post in the category “Body Build”. The day gets closer when I leave to QLD for the body to go on. One of the main activities the last three days was double checking measurements. The paper specifications of the windows, doors and baggage doors are all 5-10mm wider than the actual cut-out needs to be.

I was wondering about that but from the answers I got from the manufacturers of the items it is just for fitting purposes. All these items are custom made to measure and are not mass produced with a fixed size. The […]

Overdue Update

By |September 30th, 2015|CHASSIS BUILD, COMPONENT BUILD|0 Comments

If you read this on facebook you are missing 11 images. Only the website has all the images in a post.

Ten days now since I posted last. Lot’s of things were happening including some rubbish removal and clean up, electronic work, many little things on the chassis, my commercial project, some kite surfing, fitted the exhaust of the truck again  and some more shopping for parts.

More than 20 years of my IT history went into the rubbish. A shame really, all still working but nobody would use a 21″ tube screen anymore. I also dumped my NeXT computers, […]

IT IS DONE – Finished Welding

By |September 20th, 2015|CHASSIS BUILD|2 Comments

Last three days were busy with finishing all the little bits of the frame and TIG welding them together. Yesterday I finished the last pieces and then my mate MIG welded the riveted frame components to the thicker chassis pieces.

The outriggers in the front were welded to the neck frame.

The front panel support rail is fitted.

All the frame components for the underbelly cover are fitted and welded.

It is handy to have the strong hydraulic legs to lift the chassis. Easy access from underneath, however the manufacturer recommends not to use them for changing tyres. We should have used axle […]

BMS – Arduino Uno To Mega

By |September 16th, 2015|COMPONENT BUILD|0 Comments

Tonight I was working a bit more on the BMS. Yesterday I received the Arduino Mega 2560 to replace the Arduino UNO. The reason is that the Uno is limited with IO pins, I was using the IO extender, and has less memory for program and variables than the Mega.

I can remove the extender shield now. The top image shows a more compact setup, the horizontal extender keeps the configuration low and gives me space to mount the custom circuits. The picture shows 2 relays on one side of the extender. The other side will be used for the […]

Underfloor Storage Frame Finished

By |September 16th, 2015|CHASSIS BUILD|0 Comments

well almost.  Just a few bits left on the rear right. I also added a few of the underbelly cover supports. These are t-sections across the underside of the trailer. These will be used to hold the cover sheets of alu honeycomb 6mm panels. These panels will cover the whole underside from front to rear.

I have to do a few more of these tomorrow and then the lot will be welded. In the middle section is a bit more to do because the trailing arms require a bit extra work to go around them and cover everything else.  I […]

Underfloor Frame Welded

By |September 15th, 2015|CHASSIS BUILD|0 Comments

Today I continued with the underfloor frame in the front and on the right side.  The front is finished and the right side is half done.

In the afternoon a mate came by and helped me with the welding.

All the frames, which are finished so far, are now welded together. We used the TIG welder for all the 3mm to 3mm alu.

The connection between the frame and the thick chassis components will be done with the MIG welder.

As it looks right now I will be finished with all the frames and the supports for the underbelly cover by Saturday evening, […]

Under Floor Frame Continued ..

By |September 14th, 2015|CHASSIS BUILD|0 Comments

Today I continued with the frame in the front left of the chassis. Takes a while, pretty fiddly to get this nice and straight.

I have checked some measurements from the plan and took some baggage doors to the chassis to double check positions. My wife and I and a bit of a discussion about pull out table in the front, table height, pass through shelf to the kitchen and door position and a couple of other things.

Looked a seating height with the pull out table outside, opening direction of the door and the placement of the door. I am […]