Load Share Valve

By |August 26th, 2015|CHASSIS BUILD|0 Comments

A couple of days ago I received my air solenoids for the suspension system. These are electric actuated pressure valves are used to connect two airbags and equalise the pressure. They have a pressure input and a NC and NO output. 12V operated they are driven by a microprocessor and a local switch. The purpose is to make sure both airbags on one side have the same pressure while the air level system lifts the van to the pre programmed position. Because the wheels in a closed coupled system are so close together the height sensor on one wheel […]

Fresh Water Plumbing

By |August 24th, 2015|CHASSIS BUILD|0 Comments

Today I resumed installation of the water tank connections. Had to get a few more hose clamps. I had been thinking a while what to use for inlets and outlets, if I should use pex or push in fittings with standard 12 mm piping etc.

One reason I use food grade hose and hose clamps with poly fittings is weight again. I have motorised ball valves at the inlets and outlets of each tank, they already add up in weight. A lot more brass fittings would considerably add to the weight.

I will use pex for the hot water connections where […]

Manual Air Control

By |August 24th, 2015|CHASSIS BUILD|0 Comments

Another kg of unaccounted weight .. they will be gone by the time I am finished.
went and got the bits to finish the airlines.

Top image shows my manual backup solution for the air level system. I am not going to use the switches, at least no intention in the near future to wire them up although I could. I will mount 4 Schrader valves for manual inflation if everything else fails. It was cheaper to buy the unit with the switches than individual twin needle gauges.

 

Done some more electrical stuff. This is one box with waterproof plugs, they will […]

Tank Breathers

By |August 22nd, 2015|CHASSIS BUILD|0 Comments

I started to put the breather lines in.. I had already mounted some smaller stuff but then decided that I am going to regret a small diameter on the breather when I want to fill the tanks quickly from a high volume source or want to do some transfer pumping.

Making sure they run higher than the breather connections to the tank. Have seen some real bad work on a couple of caravans from a local dealer here where the breather lines run lower at some points and can easily get filled with water and there is no way for […]

Air System – Tidy Up

By |August 22nd, 2015|CHASSIS BUILD|0 Comments

Today we had a few hours good weather and I used it ..
Cleaned up the wiring around the air engine and the components ..

 

the empty ports on the manifold are going to be used for the load share solenoid when
they arrive .. 3/8 hose with compression fitting to the solenoid ..

 

Air System – Operation

By |August 18th, 2015|CHASSIS BUILD|0 Comments

Two images showing the difference in height between low and high.

 

 

The first video shows the lift from lowest position to standard ride height.

the next movie shows the chassis dropping to lowest position.

and the next one shows the lift to highest from lowest. That
was the test when I took the measurements of the final set up.

The top image shows the panel at max height.

At the moment the chassis is very light so the lift is pretty quick. This will take a bit longer when the van is finished.

I could fill a few pages with the pros and cons and […]

Air System Fix

By |August 18th, 2015|CHASSIS BUILD|0 Comments

Have worked on the air system to day and finally got everything fixed an working. Took another effort because there were more leaks right at that air engine.

I fixed the main leak and then there were still small leaks around the flow adjuster screw. I fixed that too and then all was tight, BUT it did not survive the rattle test. That’s when I go over everything and rip at the cables and lines and wiggle and push and shove to see if it holds together. Spay some foamy water on it and wiggle again .. check the pressure […]

Air Leak

By |August 17th, 2015|CHASSIS BUILD|0 Comments

Today I swapped all the useless push in fittings with compression fittings using the same plastic hose. Had to tap 4 fittings with NPT thread at the mechanical pressure gauges. I only had BSP fittings, but it worked fine.

All my new connections were tight right from the start, should have done this in the first place BUT Chinese/American or whoever done that struck again:

The main connection of three of the 4 fill valves leaked where the connection goes into the body of the valve. One would expect that such things get pressure tested.. far from it I guess… This really annoys me […]

Switch Mounting Bracket

By |August 15th, 2015|CHASSIS BUILD|0 Comments

Then today I made a mounting bracket for the some switches next to the pressure gauges. Takes a while when you have only limited tools.

Finished wiring and then started the air system when disaster struck.

The compressor output of the control unit does not have and power although I put a relay on it and not the compressor itself despite instructions that this is possible. I did not trust the cable coming out for 40A and the compressor draws slightly more anyway.  But there is no voltage at all on the wire. Ok, I will have to go through the […]

More Cables

By |August 15th, 2015|CHASSIS BUILD|0 Comments

Some setback today .. damn frustrating, but I come to that later.
Yesterday I had two main tasks, putting more cables in, wiring everything up and finishing all airlines was one and the other was my commercial project. Was in and out of the office, so my time outside was limited.
Anyway .. I got all the wires in and a few were left to connect today.

 

 

BMS- Wired Up

By |August 13th, 2015|COMPONENT BUILD|0 Comments

Have wired up the components for the BMS. The image shows a couple of relays on the right which were not in the image further up. These are the relays for charge disconnect and load disconnect.
I will not use those, they are not latching, well at least not mechanically. I will use latching relays to avoid permanent power to the relay to avoid heat build up and power loss. The ones in the pic are latching but electronically. The processor stack has another shield on top. It is a IO extender because with this application I need more analog inputs […]

BMS Components

By |August 12th, 2015|COMPONENT BUILD|0 Comments

Have started to put together that bms system. These are the components ..
The bits at the top are just to simulate the battery input for testing.
The processor with Can bus interface and the screw shield on top with the resistor network for voltage division. I measure each cell to the same ground, makes it easier.
Left are the 4 relays to engage the DC chargers for each cell with a current sensor giving feedback about the additional charge going in. The other board is an opto coupler board for the arduinos outputs to 12V because I am using a 12V relay […]

Air System – Air Lines

By |August 12th, 2015|CHASSIS BUILD|0 Comments

Started to put in the airlines in. The air engine is connected.

Airbags are connected

The manifolds for each airbag are mounted with all connections and the additional pressure sensors.

A few bits are left and the main air supply line does not fit, will get that fixed tomorrow morning and then I will finish the rest. We expect rain again, so I will get the bits first.

 

 

 

 

 

Air System – Initial Setup

By |August 11th, 2015|CHASSIS BUILD|0 Comments

Good weather, done some work .. still moving data around the computers
couple of terabyte take time to copy .. Ubuntu times out when nas is too busy..
have not had that problem before, but no intention to solve this for now, so
I did not do too much in parallel and left the Linux box do it’s thing..
All data is recovered from the busted raid .. that was another reminder to
keep backups up to date.

Anyway .. I wired the air control unit. Started with the airline but one is wrong ..
I did not double check in the shop and they did […]

Level System Parts List

By |August 8th, 2015|COMPONENT BUILD|0 Comments

Correction to the previous post.
Finished the documentation about the box including the parts list

Keypad 4×4 buttons $3.00
Arduino Uno R3 $5.00
Can Bus Shield $13.00
2 Line character Display $12
Box 150x120x90 $13.00
Gyro module $5.00
2 4 Relais boards $18.00
2 DC-DC power supllies $2
1 16 DIO IO Expander shield $9.50
1 Screw shield $8
1 Temperature sensor $1
1 Voltage reference $1.20
1 Opto DC In board $8.95
1 I2C Hub $4.95
6 panel connectors $2.40
Cables & internal connectors $3.00

Total: $108

So not $85 .. cost was $108 .. original plan was higher because I thought I use two boxes and one with waterproof connectors.

Now I have only one box and cheaper […]

Level System Remote Control

By |August 8th, 2015|COMPONENT BUILD|0 Comments

Cold and miserable outside.
Had a good day in the electronic lab..
Finished the levelling control unit completely. Tested all features and it works perfectly .. now I only need to make the cables  to connect right into the existing harness and it should work with the trailer. Am quite optimistic. Tilt switch is very sensitive, so I should get good reactions wherever I mount it.

Had a little bit of trouble fitting all in 32k of memory, and removed the orientation calibration – used fixed orientation – but now everything works and I might just add it again.

I also tested the Can bus […]

Air System

By |August 7th, 2015|CHASSIS BUILD|0 Comments

Not much done today up to now.. just running around getting things organised
I picked up most air parts … they were short 5 fittings .. I took all of their stock ..unbelievable..
So I had to go to another place and they had only 5 but at least drilled out the 5 NPT fittings for me to fit the 10mm pressure sensor. Also got the mounting box for the air control unit, the other one I had  was just too big.

Went by the accountant, picked up some alu and bought two large discs for my NAS because I am running full.
Now […]

Level Control Box

By |August 6th, 2015|COMPONENT BUILD|0 Comments

Finally … the control box for the levelling system is closed and still working
Finished all the wiring tonight .. pretty tight.. usually I don’t like it that tight,
but if I would wire it following industrial standards it would be too big. It is a one
off, so developing a PC board for it would be really a bit over the top

Now I need to finish the software.. Manual mode is working. battery voltage and internal
temperature is read and displayed. Calibration function is done and now I need to finish
autolevel (grounding is done) and hitch/unhitch lift.

I will […]

Tank Lids And Senders

By |August 6th, 2015|CHASSIS BUILD|0 Comments

Just a quick one, pretty busy …

Other stuff all morning, those other projects having an impact on my schedule ..

Afternoon I done some more plumbing.
Even unpacking takes quite some time .. the rest of the tank inspection openings, the tank senders and  breather filters.

Finished all the inspection lids and the tank senders in the watertanks. Have to do the tank senders in the holding tanks.  Have to source some fittings for the gray and blackwater inlets into the holding tanks. They only have outlets.

Tonight I finally ahve to finish the control unit for the legs, at least the hardware. […]

Air System

By |August 5th, 2015|CHASSIS BUILD|0 Comments

Yesterday I went shopping for some air fittings.
Not all in stock where I usually go. The place is looking run down. I may have to change suppliers I guess. Damn traffic in the afternoon, one looses so much time going to shops.
I much prefer online shopping but sometimes delivery from China is a bit long when you need to get things working. So far I have been pretty good in ordering things in time. Only a few items I was running short, not really a problem.

Yesterday I also extended my levelling leg control unit and tested the CAN bus, but had […]