Level Control Box

By |August 4th, 2015|COMPONENT BUILD|0 Comments

Level control box is almost done ..
All the components are in the box and it is still working   Need a few more wires and the connectors need to go in.  The USB panel connector is in, so I can still update the software
without opening the box.

The front plate. I was a bit impatient so the cut out was not perfect, but good enough for now.

Late now, so I will finish Wednesday. Later today I have other things to do. Anyway .. not too far away anymore from replacing the Bigfoot unit.

More ABS Testing

By |August 3rd, 2015|CHASSIS BUILD|0 Comments

Busy day, although I did not do much really, not even my shopping. After adjusting the shocks yesterday I went for another drive. I had around 2.7t weight on it and the bags had 50 psi – empty I had 18psi at the same ride height. I also tested and calibrated the ABS and it works well now, bedded the brakes a bit more with some progressive braking, will do that a bit more though. The workshop manual for my JH7 front brakes requires 20 brake operations with progressive pressure and various speeds. I also tested the trailer by […]

Level Control Unit

By |August 3rd, 2015|CHASSIS BUILD|0 Comments

Finished the prototype of the level control unit late yesterday after some more documentation. The image below now shows all the components, which go in a box tonight. The limiter switch inputs from the legs go through an optocoupler board for input protection of the arduino and a defined, noise free signal. The components are named in the image.

I have extended the software to interpret the limiter switches, which I currently simulate with that orange cable and the wire at the tip.

The rest of the software to be done is some value display of the battery voltage and angle […]

Level Control Unit

By |August 2nd, 2015|CHASSIS BUILD|0 Comments

Made good progress tonight with the levelling system.

The image below shows the main components:
The accelerometer (to the left), the display (16×2), the keypad, the Arduino with CanBus and IO Extender shield and the test output for the relay controls.
I use the led row to verify the signals for the relay outputs to start the legs. In the final box I will have 8 relays, two for each leg (up and down).

Below is an example of the display content during auto level. It shows the status of each leg and the direction of movement.

I have finished the calibration functions, all […]

Air System

By |August 2nd, 2015|CHASSIS BUILD|0 Comments

Done some office work today .. taxes .. not really exciting ..

Had a few hours outside and late afternoon on the computer.
First of all I adjusted my shocks to level 9 (maximum stiffness) from level 5 (medium) and will give it a try with the weight on. Probably a bit too stiff for the current weight, I will see.. More importantly I added some air in the hitch bag to make that a bit stiffer too. Eventually I will fit a shock also onto the hitch. This will reduce possible up and down movement further.

I also had a […]

Putting the Weight On

By |August 1st, 2015|CHASSIS BUILD|0 Comments

Today at a friends place I filled water into the tanks. We don’t have a large enough water tank to waste it, they have huge tanks and we will get some more rain anyway.
The image shows nicely why a goose neck (ball coupling) is so much better than any 5th wheeler.
And that twist was only a small one. The truck is still level but the trailer already on an angle of 7 degrees. I wanted to level the trailer using the levelling system and it said: “Too much angle” and did not do anything … dohhh .. what a rubbish […]

By |July 31st, 2015|CHASSIS BUILD|0 Comments

A bit of a sad thing happened this afternoon, however it was unavoidable and ended
very peacefully.

We had to put our dog down. She deteriorated today very quickly. Was on and off the last weeks but today it was just time. Many signs from here that she was ready to go.

We only had her since a year, the original owner died and the kids wanted to put her down. We had her as a foster dog for a few weeks and arranged to keep her. She was a very special dog and not only to us.

She went very peacefully and quiet. […]

Weight Test

By |July 31st, 2015|CHASSIS BUILD|0 Comments

This morning I picked up my PVC containers, 6 of them.
Yesterday I removed the floor, not going to kill that floor with 1000kg water tanks sitting on it.
I placed some timber beams under the container cradles.

I made some progress yesterday evening with the new control unit for my hydraulic levelling system.  The tilt sensor works very well, much better than the original and I can actually put everything in one box. The original is a control unit and a display/keypad unit connected via a serial cable. I decided to put  everything in one box because for my system it does […]

Inspection

By |July 30th, 2015|CHASSIS BUILD|0 Comments

It is done !
Inspection took place this morning, passed with flying colours.
Now my wife will go to the licensing center and get the number plate.
Tomorrow I will pick up 5 1000l water tanks for my kids and a friend
and I will use 3 of them to load the trailer to the limit when filled with
water. I will fill all 3 tanks to a bit under full, that will give we 2700kg
including the weight of the tanks, which will take me to 4420kg total.
That’s enough for a test on a rough road. I plan to load it to 6t on […]

Weigh Bridge

By |July 29th, 2015|CHASSIS BUILD|0 Comments

Back from the weigh bridge.
Trailer towed very well, no jumping, no rolling – just as it should be – very smooth.
The brakes are hyper good but that comes at a price .. I am 180kg over my originally
calculated weight. But that is what I expected, have more alu in the chassis than
originally planned, the air engine and the air tank was not in the calculation, cables,
brake lines, brake locks, bolts, lights .. it all adds up. The brakes and trailing arms are really  heavy duty and the luxury of having my dually wheels on the trailer cost another 45kg for […]

Accelerometer

By |July 29th, 2015|COMPONENT BUILD|0 Comments

Tested the new accelerometer, I did order 2 different ones for evaluation, and found the one to use for the control unit of the levelling system. It has good resolution and I finished the function to read the raw data for x and y axis and converted to degrees.
Because the chassis is that long I only get small variations in tilt compared to the displacement of both ends. So I need good resolution for the values. This one delivers enough and is also very sensitive.
It is a good basis for the level control. This is pretty much solved now. […]

Getting Ready For Weigh Bridge

By |July 28th, 2015|CHASSIS BUILD|0 Comments

Tomorrow I am off to the weigh bridge. A bit nervous .. I have not calculated the weight of the exact configuration I have now, only the trailer chassis with a few more things on it and I have used a bit more alu than originally planned. A few extra braces here and there, t-sections between the floor sheets, quite a bit of extra weight not included in the model as yet. I went 50×50 for the outriggers and not 40×40 as planned originally, I even used some 6082 C channel for step supports and a couple of other […]

BMS DC Balancer

By |July 28th, 2015|COMPONENT BUILD|0 Comments

Today I received more parts, the proper low g accelerometer for my levelling system and a couple of other sensors, and also the DC-DC power supplies for my BMS to do active cell balancing. The little power supplies will be used to boost charge of a low cell.

The special thing about these power supplies is that they have a current limiter. I can adjust the charge current I want for cell balancing.

Will work on both, the levelling system and the BMS in the next time.

I have a couple of other boxes to finish and that is the valve controller ( […]

12V Hub

By |July 28th, 2015|COMPONENT BUILD|0 Comments

Rainy day in the office – done work on the website project.
Tonight I finished a 12V junction box for more processor box connections. It also doubles as CanBus junction box, at least for the moment. One can see the terminator plugged into the out connector.

I use standard 4 pole connectors for this, all the same despite the fact that I only  use two pins. The proper way would have been to use different pins for the 12V and the CanBus, but I decided to use the same. This makes testing easier but one has to be careful which plug goes where. […]

Tank Inspection Lids

By |July 27th, 2015|CHASSIS BUILD|0 Comments

Next step was to try the inspection lids I have for the water tanks. I need these to fit the tank sensors. This is the price I pay for the luxury of continuous tank level readings and not just 3 or 4 steps. I could have done without the lid but the the tank sender does not get fastened from the inside of the tank and I don’t like that idea. Although the tank sender fitted very tight into the 35mm hole, it is just better to have it properly fitted with it’s designated nut from inside. Also the lids […]

Air And Pumps

By |July 27th, 2015|CHASSIS BUILD|0 Comments

Busy day today.
Tomorrow we expect rain early so I tried to get as much done today as I could without stress.

Fitted the air tank .. stainless steel pipes welded together. With a stainless steel strap.
Two images show the tank from above (top image) and below.

Fitted the small compressor. Image below shows the compressor but the wrong way. Later image shows in correct position.
This is only a small one for the air engine and can alo be used to air the tyres, however I have a bigger compressor on the truck for pumping up the 6 tyres after a sand […]

DMX-Manual Box

By |July 26th, 2015|COMPONENT BUILD|0 Comments

Tonight I have finished another control box. This is a combination of DMX bus for light control and RF remote dimmers for manual switching. This box allows both manual and central control of the monochrome strip lights connected to the box.
Three channels are combined in one box for 3 separate light circuits of monochrome strip lights.

More and more different types of boxes are getting to the prototype stage. One of each kind for final testing before I make the quantity required for each type of box.

 

More Underfloor Work

By |July 26th, 2015|CHASSIS BUILD|0 Comments

Done a few things again outside.
The covers for the pump cases of the levelling system are on. I did cut the rest of the floor capping to finish everything tomorrow before the rain comes again on Tuesday. Wednesday is weigh bridge day.

The air engine is placed now on the chassis, no airlines yet connected though. This will come after registration. At the moment it is a simple load sharing manually controlled airbag suspension. This will change before I finally glue the floor. It is easier to finish the under floor installation that way.

Same applies to the plumbing of the tanks. Worked […]

Trailer Cable

By |July 24th, 2015|CHASSIS BUILD|0 Comments

Today I finally mounted the Anderson plug in the tub to connect power to the trailer battery.

The Anderson is rather primitive for that application since it does not contain any mechanism to clamp the insulation of the cable and all the weight and pull of the cable is hanging on the crimp contacts.

Not a great solution in general and not really good in my case. I thought about those 3 phase plugs with screw ring, but they are just too bulky. So I made my own clamp with “quick release”. not crash hot but it does work .. loosen […]

Component Network

By |July 24th, 2015|COMPONENT BUILD|0 Comments

This is how the components will be connected.

The one in the foreground is still in the making, the others are finished.
The Ethernet gateway connected to the DMX controller and that connected to a DMX hub and all supplied from a 12V power hub. This is how the system will be built .. all little building blocks with different functions and everything connected with straight cables.

This part of the network is working and all the boxes will get a shake and rattle test before they go into the van. I will only have very limited wiring to do at the […]