Running Gear Mounted

By |June 3rd, 2015|CHASSIS BUILD|0 Comments

Today I have installed the running gear on the right side of the trailer and designed and prepared a couple of mounting brackets for brake lines and ABS cable. Done other bits and pieces including the mounting bracket for the ABS actuator.

When I have fitted the mounting brackets for the brake lines I will then connect the brakes to the ABS actuator.

As I go along I document each step in my Installation WIKI with images .. better than descriptions ..

I have uploaded a sample page of today’s work. For each component I will document how it is installed and/or […]

Wiring Bigfoot

By |May 31st, 2015|CHASSIS BUILD|0 Comments

Still working on the wiring for the legs.

As I said earlier, the waterproof connectors take time and I accept nothing less than 100% when it comes to crimping the contacts. I just recently repaired some electrical stuff on an Avan and connector fitting was appalling. Insulation to short and not reaching into the housing of the plug, crimp connections only on the copper strands, not on the insulation, electrical tape used instead of heat shrink, etc. The current owner did not do it, I am certain. Could have been the previous owner though.

The harness for the levelling system was far too long and the […]

Motorbike Carrier

By |May 30th, 2015|CHASSIS BUILD|0 Comments

Yesterday I hooked up the van for the first time to the truck and also fitted the motorbike on the back of the truck to see if everything works out. The front legs are not on yet and the chassis is a bit higher than ride height. We finished all welding on the thick stuff, completely done and use one 7kg role of wire so far.

Today I did put all legs back on and wired the electrical connections. Takes some time because I had to cut the harness provided (just way too long) and fit connectors. Waterproof connectors take time to fit, […]

Truck Brakes Again

By |May 30th, 2015|CHASSIS BUILD|0 Comments

Last Thursday I finished the brakes on my truck all around. Put the new hub seals on the rears an all new rotors are fitted. Below image shows the front. I am not really keen with drilled and  slotted rotors but I wanted some galvanised ones, not just the regular steel, and these still came at a reasonable price including metallised performance brake pads. Will use the same on the van.

Because I changed the ball joint I had the torsion bar off and along the way putting it back together I did bend a C-clamp. I think I should reduce […]

Coupling Receiver

By |May 26th, 2015|CHASSIS BUILD|0 Comments

Not bolted on yet, will do that tomorrow. I did remove it twice until I had the membranes fitted properly and everything was where it is supposed to be.

Mud guards are almost finished, will do that tomorrow as well.

Truck Brakes

By |May 24th, 2015|CHASSIS BUILD|0 Comments

Today was service day for the truck.
Installing my anti gravity engine – floating 30cm over ground .. would’nt that be nice .. and all running on water vapour.

Done the left side ball joints and stabiliser, (did the right side a few weeks ago), rear brakes, new rotors all round, new pads, new park brake pads, new front flexible brake hoses. Did not finish the rear – need new axle seals to make sure they are real tight. The drive shaft and bearings run in oil from the diff, so no grease or packing, just making sure the seal is real […]

Chassis On It’s Feet

By |May 22nd, 2015|CHASSIS BUILD|0 Comments

Here it is, out of the shed, on its feet with the neck fitted.

Some detail pics: The powder coater ended up making the stuff black although I told him I wanted a bright colour. Anyway it was a lot cheaper that way, and one does not see the chips that much. The coupling mount in the front however is a nice bright safety yellow.
Will fit that tomorrow.

Side view of one trailing arm, one shock mounted only and the limiter strap in place.

Image of the airbag plate from the top with the temporary air lines. Currently in load sharing configuration […]

Bigfoot And Battery

By |May 21st, 2015|CHASSIS BUILD|0 Comments

Another day gone …

Half the day was shopping.
Battery – picked up at ev works
Brake lines, total of 16m lines and fittings for the ABS systems.
Bolts and Nuts, threaded rods for the axle sleeves, air fittings and hose for the air bags. Just temporary stuff until I fit the air engine with the levelling system.
Mounted the battery. Did not do the case yet. Just the mounting platform.

Finished temporary install of the Bigfoot levelling system. Temporary because the cables are not yet properly routed. Everything else is final. The cables are way too long. Made for US 40 footers with the panel […]

Brake Actuator

By |May 20th, 2015|CHASSIS BUILD|0 Comments

Lots of things happening … including a car accident .. some puppet had to push 4 cars into each other and I was the front one. Had our little city car and the poor thing is now in car hospital. I am ok, no problem, just very annoying. When do they learn to drive in Australia?

Anyway .. back to the subject ..

The electric over hydraulic brake actuator is mounted in the front of the lower chassis.

Mounts for the rear holding tanks are in, the middle section between the two tanks is not yet done.
All the floor supports are done […]

Main Chassis Frame Welding Almost Finished

By |May 18th, 2015|CHASSIS BUILD|0 Comments

Done some more welding today. The rest of the main chassis welds were finished and the first welds done for the thinner alu, like the floor supports and some tank hangers.
Have fitted the first leg as a test.

All the steel parts are at the powder coaters and I expect them to be ready by Thursday. During the week I have to organise lots of little things. Next Friday we plan to put the wheels on and pull the lower chassis out of the shed to mount the neck.

I have some 6mm channel in 6082 which I will cut to an angle to […]

Mounting Suspension Hangers

By |May 16th, 2015|CHASSIS BUILD|0 Comments

Two very busy days, yesterday and today.
Done lots. Finished all alu welding on underside and all steel welding.
First time I had all suspension hangers mounted to fit the trailing arms.

Above shows all 4 trailing arms mounted for alignment and tacking on the blocks.

Above shows a wheel from behind. Have sorted out the routing of the flexible brake line and the bracket mount on the trailing arm to securely fix the brake line. Made little plates and welded them onto the trailing arm.

Finished the bumper mounts. Sacrificial bumper and mounts. If someone bumps into us it will take some of the […]

Coupling Brace

By |May 9th, 2015|CHASSIS BUILD|0 Comments

These 4 and 4 more were the last bits I had from cutting the 5 9.9m RHS main rail sections. They are now the rear mounts for the bumper and the the other 4 are gussets for the cross member which holds the angles from the coupling braces. I have nothing left from those long sections, just a few shavings.

 Fitted the coupling braces to day and tacked them. The last bit of steel welding. Tomorrow I will continue cleaning the parts from splatter, like I started today to get them ready for powder coating. Pretty heavy now that coupling bit. […]

Coupling Welding

By |May 8th, 2015|CHASSIS BUILD|0 Comments

Another busy day over.
My laser cutter did let me down a bit and did not finish a couple of parts I wanted to use this weekend.
Anyway, my mate was here again and we almost finished all the steel works. Trailing arms are done, the shock mounts on the trailing arms as well as on the chassis, two of the airbag platforms, waiting for a couple of parts for the other 2 airbag platforms to finish.

Above is a pic of the outer coupling tube. The actual coupling slides into this tube. Obviously this is upside down since the neck still lays on the […]

Flange Gusset

By |May 2nd, 2015|CHASSIS BUILD|0 Comments

Above is the image of the flange gussets I was talking about. Not cleaned up yet, just shown as welded.

Steel Welding

By |May 1st, 2015|CHASSIS BUILD|0 Comments

Done steel welding today.
Tacked and fully welded all trailing arms and started the coupling mount. Checked the wheel position and clearance as well as calculated overall width. Above image shows one wheel mounted on a trailing arm with the center cap. The wheel liner (stainless) is not on the wheel, so it is a bit ugly. Outside center cap left to right is 2480mm. Without center caps its is 2420mm from tyre face to tyre face.

The trailing arm distance from the inside face of the flange ended up 1mm out from the  original design. I am pretty happy with that. The reason was in […]

Welding The Neck Section

By |April 26th, 2015|CHASSIS BUILD|0 Comments

Was a good day today. Finished welding of the neck. It sits on top of the lower chassis upside down.
Very sturdy, massive gusset hold it together in all directions, will have very little twist.

Below is one trailing arm sitting on a suspension hanger. Waiting for the part, which is redone, until I can fit
the last cross member. Looks all good though. All measurements are spot on and everything is very much like it is designed.
We have under 1 mm deviations from the planned measurements, which is amazing considering how alu pulls in when you fully weld it.

Below is a pic […]

More Welding

By |April 24th, 2015|CHASSIS BUILD|0 Comments

Yesterday and today I was working on the chassis.
The rubber membrane for the separation of the steel suspension hangers from the alu mount plate has arrived.
The neck SHS is back from my machinist with all the holes drilled.

I have tacked up some cross members and work on fitting the suspension hangers but have to do a slight modification. Not enough clearance for the 1.5mm membrane. The last version of the new counter plate (I had that redone) is still no good. I was sloppy in calculating the total width and forgot to take one layer of membrane into account. I did not […]

Welding Chassis Frame

By |April 17th, 2015|CHASSIS BUILD|0 Comments

Busy day, had a few beers after work and got too late for pics.. was dark by then.
The suspension hangers are welded up, no problem at all .. no bending – easy
The trailing arms are tacked, the axle sleeves are welded to the hub adaptors and we
put the the outer cross members on the chassis after we did set it on the saw horses
and got it level. That took actually only a few minutes, totally surprising, once we had
the main rails on the saw horses and just eye balled the levels and direction and the measured it with the laser […]

Cutting Steel Parts

By |April 16th, 2015|CHASSIS BUILD|0 Comments

Today I did cut all my steel parts for the trailing arms.
I prepared the steel parts we intend to weld tomorrow including the suspension hanger plates.
Above is an image showing all 4 suspension hanger plates lined up through a 1.5″ steel rod to keep them perfectly aligned when we weld.

The mounting blocks for the trailing arms will be pressed between the hanger sides with a couple of blades from a feeler gauge to give it just a tiny bit of play(0.05mm) and more importantly all the same. The hanger plate is 8mm steel and will be bolted to a 10mm alu plate […]

Second Chassis Rail

By |April 11th, 2015|CHASSIS BUILD|0 Comments

Today we finished the second main chassis rail.
Went really well and was good working in pleasant conditions, a bit rain once in a while but nice temperature.

After finishing the main rail we started the neck section.
The two side pieces first.

Tacked up to keep them nicely symmetric and then fully welded on both sides to keep them aligned. If one side should pull in a bit the other would follow.
The heat and the smallest of gaps can distort a perfectly aligned angle.

Massive brace under the neck will hold everything together.