0414 740 669

Chassis Rail Finished

By |April 10th, 2015|CHASSIS BUILD|0 Comments

We have finished one rail 8650mm long and 5.80m at 9″ high and 2.85 at 12″ high.
Massive beam, which is calculated to carry 5.5t at a required strength of 1/6th of the yield strength of the material.
The whole trailer is calculated at 6t maximum capacity at off road standards.

We will do the second rail tomorrow.

I also received another bunch of Visduinos today from China and am doing a few more compatibility tests.
The Visduinos appear to be better than some of the Arduino clones I got from an Australian seller (most likely also from China).

The First Weld

By |April 10th, 2015|CHASSIS BUILD|0 Comments

Today (10-4) welding started in earnest. First step was tacking the main rail and the sub rail carefully from both sides. We marked the intended welds, staggered on both sides with some gaps and the tacked the two pieces carefully to keep them straight. Not paying attention to evenly spread the welds, and not too close in the beginning, might result in a banana shape. It is quite amazing when you see how this big beam can bend by just misplacing a couple of welds.

The main rail is 9″ high with a long section behind the suspension of 12 […]

Ready For Welding

By |April 9th, 2015|CHASSIS BUILD|0 Comments

All the pieces are cut and the shed is ready to start welding tomorrow. My mate is coming in the morning and we will start putting it all together. Will be interesting.

So finally it is going to happen and the actual build commences.

 

Suspension Hanger

By |April 9th, 2015|CHASSIS BUILD|0 Comments

Little gussets, the main alu plates (10mm) for hanging the suspension mount, the newly made counter plates in 6mm (they fit perfect now) and the components for the coupling mount. Those big pieces at the right top are the two braces for the coupling mount. The neck itself is with my machinist at the moment and gets a few more holes. 4.5″ square steel 1/4″ thick is nothing
you work on with an amateur drill stand. I also have bought the stainless steel bolts, mudguard washers and lock nuts to fit the suspension mounts and the coupling mount. The coupling […]

Cutting Material

By |March 28th, 2015|CHASSIS BUILD|0 Comments

I made a bit of progress in several areas.
Cutting is going quite ok, have done the two beams with the most cuts. Two more with only a couple of cuts, because they are the main ones, and one more mixed length one.
The number of puzzle pieces is growing. We will start welding on the weekend after the next long one.

The picture below show the cut off of beam two. This is about the average cut off. Less then 10cm from a total of 49.5m.

Rear Deck – Thoughts

By |March 28th, 2015|CHASSIS BUILD|0 Comments

We had a discussion about the rear deck again and have decided that we want the deck but not the sky-deck from Melbourne for several reasons. One is price of course. 15k is over the top, but more importantly it has a design problem.
After looking closely and making a few calculations, and also some statements from the conversation on the phone made me sceptical. I was told that the sky-deck does not like a twisting body at all and that internal stiffening is important.
This made me think. The fact that the sky deck has only the support from the roof end […]

The First Cut

By |March 25th, 2015|CHASSIS BUILD|0 Comments

Today I adjusted the saw to a perfect 90 degree angle to the blade to make sure that I have very nice right angle cuts. I used one of the machined mounting blocks which I have from my machinist for the trailing arm hanger. These blocks are absolutely perfectly square and ideal for the job.

Having done that I realised that this angle is ok to adjust without additional tools but the other problem is the vertical angle. Over a length of 9m a minimal angle away from a perfect horizontal level will result in a not so perfect vertical […]

Solar Panels Arrived

I added a couple of pages to the website.
One about the 240V system and one about my first cut with a little video of the saw in action.

I have adjusted the saw perfectly square and will get a laser level tomorrow for the vertical adjustment.

The solar panels came today, so now all my components for the 240V system are here, the batteries, inverter/charger,
solar charge controller and flexible solar panels.

The cables on the solar panels are pretty long, I will have to shorten them in groups of 4 because the panels will be rather close and I don’t like the long […]

Receiving components and thoughts

Done lots of things, little stuff but lots. Today I picked up the steel for the trailing arms and the rods to make the jig for the suspension hangers. Will talk about that later .. The trailing arms are made from 65x65x5 C450 galvanised steel (Duragal Plus).
I could get away with 4mm but decided to have more safety margin, I have a 6t rated chassis after all, so the trailing arms should not be the weakest link. I push comes to shove I can fit an air over hydraulic unit instead of the electric over hydraulic unit and go […]

Machined Custom Parts

By |March 22nd, 2015|SETTING UP|0 Comments

Today I picked up all the parts for the running gear which were machined for me by George from J&L Engineering. Great man and very meticulous in his work, unlike some of the trailer places where you get told that 2mm play is good enough for a trailer.

Above pictures shows the mounting blocks with brass bushes, the suspension bolts (1.25″) with grease nipples and lock nuts. These blocks are going to be welded onto the trailing arm and are mounted onto the hanger plate with the bolts. It is a perfect fit, with less the .2mm play, just enough […]

Optimising Cuts

By |March 13th, 2015|SETTING UP|0 Comments

Cutting a long, custom made beam is a bit like formatting a long used hard drive. You never feel certain that you do the right thing. If a cut goes terribly wrong you are in trouble because the material is not retainable anymore or only at a great loss. So preparing the cuts is as important to me as the cutting itself.

I had done something like this before I actually ordered the material to optimise the beam length for the best price/length ratio. The longer and fewer beams the cheaper the whole lot with the constraint to meet the […]

Laser Cuts – Suspension Mount

By |March 12th, 2015|SETTING UP|0 Comments

Today I picked up the suspension mounts, counter plate and the airbag mount plate.

The pieces above need to be welded on the main mount plate and the little tabs are for location and strength. Everything fits perfect apart from a little mishap.

Something got lost in translation. I missed to specify the different thickness of the material. The counter plate was meant to be done in 6mm and not 8mm like the main mount. Now I am 1mm out with the distance between the proper mount point of the counter plate and the front edge flange of the mount. I […]

By |March 12th, 2015|CHASSIS BUILD|0 Comments

Today I picked up the suspension mount from the laser cutter people.
Cutting, drilling, bending – great work ..
Had a bit of a problem though with one part. Material thickness too high, but i was my fault.
Have written about it here .. Suspension

Also today the CAN bus shields for my Arduinos arrived, so I have a bit work for the night or the next couple of nights.

I am just now finishing the drawings for the coupling mount. Since I am happy with the laser cutter people I will now get
all the remaining parts done. I like it – it is so […]

Machined Parts Picked Up

By |March 11th, 2015|CHASSIS BUILD|0 Comments

Picked up all my machined parts today .. here is the write up

Machined Parts

Early next week I will all the laser cut and bent components for the suspension mount and then we can start in ernest to put that thing together.

Cleaning Out Shed

By |March 5th, 2015|SETTING UP|0 Comments

The shed is cleaned up and ready to take the chassis. The next thing I have to do is to make some tressels to keep the chassis off the ground and perfectly level, which the floor of the shed is not.

The band saw is in position to cut the beams.

Testing Motorbike Carrier

By |February 14th, 2015|SETTING UP|0 Comments

Originally I had the motorbike on a carrier at the end of the van as most people would think, however there are a few good reasons against it. We have a goose neck trailer so the stability issue is not really as pressing as on a caravan with a larger load at the end. Nevertheless

I wanted to save a s much weight on the van as I could because the weight limits are more critical on the van than on the truck. I have a bit more margin on the truck. So the plan is now to hang the […]

Unpacked and Sorted

By |February 10th, 2015|SETTING UP|0 Comments

Two long days and a lot of sweat in 38 degrees but I got it done. Everything unpacked and sorted. I have a few different places to store everything. The truck transmission is in the truck shed and needs a forklift to get loaded again.

The tanks (10 of them) are in the stables and so are the slide-outs and the shower. The tyres are stowed away out of the sun for later.

All the rest is sorted and spread out in my studio, which I had cleared for the repair of some white ant damage. The open space comes in […]

Picking Up Container Content from the US

By |February 10th, 2015|SETTING UP|0 Comments

Our container was unpacked at the freight forwarder (DB Schenker) because of a requested AQUIS inspections. Customs did not have a problem with it, they did not care to inspect, which was to be expected with the kind of content and origin. AQUIS had a hold on it though and inspection was yesterday but brief, since they were convinced pretty quickly that all items were new, pallets were treated and tyres had no moskitos nesting in them.

So we had the additional cost of unpacking at the depot, but did pick it up and saved the cost for the container […]

Main Rails Delivered

By |February 9th, 2015|SETTING UP|0 Comments

152 x 76 x 6.35 in 6082 Structural Aluminium at 9.90m per length times 5
After a turnaround of roughly three months my main rails arrived to day from Ullrich Aluminum. They were extruded in New Zealand and the shipped here. Capral does produce in Australia but wanted 500kg minimum quantity which is way too much. Four of the five length are around 270kg (that was the minimum quantity).

I have to ask my CAD system about the weight of just the 5 length. I have never really looked at it individually only together with the other components.

It is mighty impressive […]

First Material Pickup

By |February 3rd, 2015|SETTING UP|0 Comments

76x76x6.35 in 6082 Structural Aluminium
Now the procurement phase reaches the end with materials coming in. My container has arrived in Perth awaiting clearance and possible inspection by AQIS (we will know soon). The aluminium profiles for the main rails are also in Perth now (custom made) and we await delivery any day. I am not going to pick up 9.90m long 152x76x6.35 RHS and 5 length of them. My roof rack was at its limits with the weight, but it did ok. It was not far to drive for me and I took it real easy.

Will have to go […]