0414 740 669

CHASSIS BUILD

Chassis Floor

By |June 25th, 2015|CHASSIS BUILD|0 Comments

Nice weather again today.
The floor was on the agenda today. Was a bit nervous to cut into a $600 panel and make a mistake. I actually did, but not a dramatic one. I did cut the floor already according to the final floor plan, but then realised that it would be a better idea to leave those sections on for now until it is registered or even until I really have to cut it later.
So there is a rectangular hole on the left, which I will fill back in.

I had to make to holes for the rear legs to come […]

Chassis Outline

By |June 24th, 2015|CHASSIS BUILD|0 Comments

I decided on progress over beauty and did the outline angle of the chassis
with MIG instead of Tig. I dialed back the Amps and Volts and was ok
in the corners, a couple of small holes in the flat 3mm but I can live
with that.
I finished the complete outline – the outside angle where the panels get glued on and
started fitting the floor.

I use a t section to support the floor panel joint. The t is 10mm lower than the height of the panel, which leaves a 3mm gap between panels, which will be filled with fiberglass matt and epoxy resin […]

Floor Panels Picked Up

By |June 18th, 2015|CHASSIS BUILD|0 Comments

I can hold one panel with one arm stretched out easy, very light. It is probably the most expensive floor a van can have.

Placed one board on the chassis and had a walk on it. No bending, not any movement under both of our weights with a span of 85cm of the supports underneath. Brilliant stuff, did I say it is expensive !

I measured the tank brackets and made the DXF files for the laser cutter.

 

Bigfoot Shortcomings

By |June 17th, 2015|CHASSIS BUILD|0 Comments

Weather getting a bit wet.. had only a couple of hours today .. done some TIG welding, killed my last electrode and have to wait for the new ones. My local shop wants $14 for one and on the web I buy 10 at $17 .. I refuse to pay such inflated prices, so I wait.
I should have ordered some earlier, but my practising killed a few.

Had an answer from Quadra Manufacturing about the Bigfoot Levelling system. They actually confirmed that the system is working the way it should, running the pumps on all legs until the last leg […]

Chassis Outline

By |June 16th, 2015|CHASSIS BUILD|0 Comments

I have picked up, cut and fitted the outer angle of the lower chassis.
It creates a flat surface to which the panels are glued and the top edge is flush with the 30mm floor.
The inside of the panel will be glassed to the floor.

I have not finished welding all the angle parts. I first had to brush up on mi TIG skills and adjust my welder to the material. Havn’t done that in a while and it took a moment.
Made a picture of my settings for the 3mm angle joins.

The welds are not crash hot yet, the pulse frequency and […]

More Bigfoot

By |June 14th, 2015|CHASSIS BUILD|0 Comments

Have fiddled today mainly with the levelling system. Have relocated the control box (swapped sides – left to right) and levelling is working ok now, but it is slow and the limiter switches don’t work when the legs come up.
Have checked everything, wiring correct, signal goes correctly into the control box but it does not stop the pump when the leg is up. Control box not working properly. Have written to Quadra – also the level display front to rear shows 0 all the time even if it is not level. Something is not right.

But I have decided to build my […]

Bigfoot Control Panel

By |June 13th, 2015|CHASSIS BUILD|0 Comments

Today I done all the little stuff around the brake lines, putting cable ties at all ends of conduit, tightening the connections, fitted the ABS controller and fitted a temporary home for the control panel of the levelling system.

A waterproof case for now to protect the control panel.
Later the panel sits inside the body and the case will be obsolete.
Had a bit of a problem with the levelling system until I realised that the controller was mounted wrong.
They have specified top, but not left and right. After I swapped sides it worked. Still have a problem with the limiter switches […]

More Welding And Pictures

By |June 12th, 2015|CHASSIS BUILD|0 Comments

 

 

 

Done the hanger for the front grey water tank need a middle brace still. That will come after the registration.

The brake lines are done and the brake locks are in place.

Both steps are done

and the trailer now stands on it’s own feet at normal ride height. Hardly any air in the bags at this stage with so little weight on them right now.

 

 

 

Lots Of Bolts

By |June 10th, 2015|CHASSIS BUILD|0 Comments

A lot of bolts went into their place today. I finally received the washers yesterday after 6 days (within Perth). It took 7 days for some parts from the US, they also arrived yesterday.
With the washers now the remaining bolts could be fitted.
The coupling mount is now completely fixed.

So are the suspension hangers now. The counter plate is shown from the top with the rubber membrane around and pressed between cross members. Nothing is going to move or rattle here. The bolts sit in Nylon sleeves and all bolts are press
fitted into the sleeves.

I also started to fit the […]

Brake Lock

By |June 8th, 2015|CHASSIS BUILD|0 Comments

The shocks are all done and the running gear and brakes are all mounted.
Brake lines are bend and the first wheels are on.

The flexible brake hoses are all in and secured and the steel lines are bent. I have identified the position for my brake locks. Although I had that in the model I did not have the brake lines made including the lock. I first wanted to see where I end up. Now the brake lines are bent and I could confirm the location.

The hydraulic brake lock sits after the ABS controller just before the wheel. The lock is a […]

Shocks

By |June 6th, 2015|CHASSIS BUILD|0 Comments

Busy again today. Tacked the outriggers on the lower chassis for the floor support and under floor storage hangers.
Will finish welding them tomorrow.

Fitted the shocks now in position. I use two boots for each shock .. not so much that I am worried about the body of the shock, it is the plastic adjuster and the bottom end which needs protection.

Below is the image of the adjuster.

The bottom boot slips over the adjuster and it is mounted behind the shock in driving direction for additional protection.
All precautions for gravel roads. The trailing arms are the only areas which are exposed, […]

Cable Supports

By |June 5th, 2015|CHASSIS BUILD|0 Comments

Done lots of small tasks, producing brackets and mounting cables and brake lines.
Very time consuming, finished the main brake lines from the main actuator to the
Abs actuator and fitted the flexible brake hoses at each wheel and the ABS sensor
cables.

Above angles are used to mount the control and power cables for the legs at some part of the chassis.

Fitted the brackets to hold the ABS sensor line in place and avoid rubbing on the wheel. Fitted all the little brackets which we made earlier. Had a bit help from a German backpacker doing a few things for me right now.

Securing […]

Running Gear Mounted

By |June 3rd, 2015|CHASSIS BUILD|0 Comments

Today I have installed the running gear on the right side of the trailer and designed and prepared a couple of mounting brackets for brake lines and ABS cable. Done other bits and pieces including the mounting bracket for the ABS actuator.

When I have fitted the mounting brackets for the brake lines I will then connect the brakes to the ABS actuator.

As I go along I document each step in my Installation WIKI with images .. better than descriptions ..

I have uploaded a sample page of today’s work. For each component I will document how it is installed and/or […]

Wiring Bigfoot

By |May 31st, 2015|CHASSIS BUILD|0 Comments

Still working on the wiring for the legs.

As I said earlier, the waterproof connectors take time and I accept nothing less than 100% when it comes to crimping the contacts. I just recently repaired some electrical stuff on an Avan and connector fitting was appalling. Insulation to short and not reaching into the housing of the plug, crimp connections only on the copper strands, not on the insulation, electrical tape used instead of heat shrink, etc. The current owner did not do it, I am certain. Could have been the previous owner though.

The harness for the levelling system was far too long and the […]

Motorbike Carrier

By |May 30th, 2015|CHASSIS BUILD|0 Comments

Yesterday I hooked up the van for the first time to the truck and also fitted the motorbike on the back of the truck to see if everything works out. The front legs are not on yet and the chassis is a bit higher than ride height. We finished all welding on the thick stuff, completely done and use one 7kg role of wire so far.

Today I did put all legs back on and wired the electrical connections. Takes some time because I had to cut the harness provided (just way too long) and fit connectors. Waterproof connectors take time to fit, […]

Truck Brakes Again

By |May 30th, 2015|CHASSIS BUILD|0 Comments

Last Thursday I finished the brakes on my truck all around. Put the new hub seals on the rears an all new rotors are fitted. Below image shows the front. I am not really keen with drilled and  slotted rotors but I wanted some galvanised ones, not just the regular steel, and these still came at a reasonable price including metallised performance brake pads. Will use the same on the van.

Because I changed the ball joint I had the torsion bar off and along the way putting it back together I did bend a C-clamp. I think I should reduce […]

Coupling Receiver

By |May 26th, 2015|CHASSIS BUILD|0 Comments

Not bolted on yet, will do that tomorrow. I did remove it twice until I had the membranes fitted properly and everything was where it is supposed to be.

Mud guards are almost finished, will do that tomorrow as well.

Truck Brakes

By |May 24th, 2015|CHASSIS BUILD|0 Comments

Today was service day for the truck.
Installing my anti gravity engine – floating 30cm over ground .. would’nt that be nice .. and all running on water vapour.

Done the left side ball joints and stabiliser, (did the right side a few weeks ago), rear brakes, new rotors all round, new pads, new park brake pads, new front flexible brake hoses. Did not finish the rear – need new axle seals to make sure they are real tight. The drive shaft and bearings run in oil from the diff, so no grease or packing, just making sure the seal is real […]

Chassis On It’s Feet

By |May 22nd, 2015|CHASSIS BUILD|0 Comments

Here it is, out of the shed, on its feet with the neck fitted.

Some detail pics: The powder coater ended up making the stuff black although I told him I wanted a bright colour. Anyway it was a lot cheaper that way, and one does not see the chips that much. The coupling mount in the front however is a nice bright safety yellow.
Will fit that tomorrow.

Side view of one trailing arm, one shock mounted only and the limiter strap in place.

Image of the airbag plate from the top with the temporary air lines. Currently in load sharing configuration […]

Bigfoot And Battery

By |May 21st, 2015|CHASSIS BUILD|0 Comments

Another day gone …

Half the day was shopping.
Battery – picked up at ev works
Brake lines, total of 16m lines and fittings for the ABS systems.
Bolts and Nuts, threaded rods for the axle sleeves, air fittings and hose for the air bags. Just temporary stuff until I fit the air engine with the levelling system.
Mounted the battery. Did not do the case yet. Just the mounting platform.

Finished temporary install of the Bigfoot levelling system. Temporary because the cables are not yet properly routed. Everything else is final. The cables are way too long. Made for US 40 footers with the panel […]