0414 740 669

CHASSIS BUILD

Weigh Bridge

By |July 29th, 2015|CHASSIS BUILD|0 Comments

Back from the weigh bridge.
Trailer towed very well, no jumping, no rolling – just as it should be – very smooth.
The brakes are hyper good but that comes at a price .. I am 180kg over my originally
calculated weight. But that is what I expected, have more alu in the chassis than
originally planned, the air engine and the air tank was not in the calculation, cables,
brake lines, brake locks, bolts, lights .. it all adds up. The brakes and trailing arms are really  heavy duty and the luxury of having my dually wheels on the trailer cost another 45kg for […]

Getting Ready For Weigh Bridge

By |July 28th, 2015|CHASSIS BUILD|0 Comments

Tomorrow I am off to the weigh bridge. A bit nervous .. I have not calculated the weight of the exact configuration I have now, only the trailer chassis with a few more things on it and I have used a bit more alu than originally planned. A few extra braces here and there, t-sections between the floor sheets, quite a bit of extra weight not included in the model as yet. I went 50×50 for the outriggers and not 40×40 as planned originally, I even used some 6082 C channel for step supports and a couple of other […]

Tank Inspection Lids

By |July 27th, 2015|CHASSIS BUILD|0 Comments

Next step was to try the inspection lids I have for the water tanks. I need these to fit the tank sensors. This is the price I pay for the luxury of continuous tank level readings and not just 3 or 4 steps. I could have done without the lid but the the tank sender does not get fastened from the inside of the tank and I don’t like that idea. Although the tank sender fitted very tight into the 35mm hole, it is just better to have it properly fitted with it’s designated nut from inside. Also the lids […]

Air And Pumps

By |July 27th, 2015|CHASSIS BUILD|0 Comments

Busy day today.
Tomorrow we expect rain early so I tried to get as much done today as I could without stress.

Fitted the air tank .. stainless steel pipes welded together. With a stainless steel strap.
Two images show the tank from above (top image) and below.

Fitted the small compressor. Image below shows the compressor but the wrong way. Later image shows in correct position.
This is only a small one for the air engine and can alo be used to air the tyres, however I have a bigger compressor on the truck for pumping up the 6 tyres after a sand […]

More Underfloor Work

By |July 26th, 2015|CHASSIS BUILD|0 Comments

Done a few things again outside.
The covers for the pump cases of the levelling system are on. I did cut the rest of the floor capping to finish everything tomorrow before the rain comes again on Tuesday. Wednesday is weigh bridge day.

The air engine is placed now on the chassis, no airlines yet connected though. This will come after registration. At the moment it is a simple load sharing manually controlled airbag suspension. This will change before I finally glue the floor. It is easier to finish the under floor installation that way.

Same applies to the plumbing of the tanks. Worked […]

Trailer Cable

By |July 24th, 2015|CHASSIS BUILD|0 Comments

Today I finally mounted the Anderson plug in the tub to connect power to the trailer battery.

The Anderson is rather primitive for that application since it does not contain any mechanism to clamp the insulation of the cable and all the weight and pull of the cable is hanging on the crimp contacts.

Not a great solution in general and not really good in my case. I thought about those 3 phase plugs with screw ring, but they are just too bulky. So I made my own clamp with “quick release”. not crash hot but it does work .. loosen […]

Tank Installation

By |July 23rd, 2015|CHASSIS BUILD|0 Comments

Next chapter for tank installation.

The image above shows the tank bracket brace mounted underneath the cross member. The tank brackets are bolted to that brace and it presses against the cross member and fixes all brackets in position.

The image below shows the lower brace for additional support of the brackets but more importantly as a jamb for the tank on one side, the other side has also one.

Below image shows the tank pressed into the location between the two jambs. I will have to remove it again to fit the valves, but for now I just wanted to make everything […]

First Tow

By |July 23rd, 2015|CHASSIS BUILD|0 Comments

This morning I hooked up the trailer and towed it. After 10 meters it fell apart .. just kidding I had the floor off and a few pieces laying on it and with some brake attempts I threw them off.

Absolutely awesome brakes, I only done walking speed and then pulled the handle on the brake controller to 100% and bang the whole rig was standing almost instantly.. absolutely awesome brakes. I hope nobody is tailgating me when I really have to slam on the brakes. He/she will sit in our lounge room then and  has a big bill […]

Tank Mounts

By |July 22nd, 2015|CHASSIS BUILD|0 Comments

Worked a few hours on the tank brackets and fixings. I removed another floor panel at the rear for easier access. For now I can still work from the top which makes it a bit easier.

I do the center tanks next and the mounting frame will be done in a way that
I can also fix the underbelly cover and sides for the center tanks to it.  The center tanks are between the wheel and I cannot do a full cover across the full width of the chassis, I have to box in the center tank section and leave the trailing arms out.

Further […]

Plumbing

By |July 20th, 2015|CHASSIS BUILD|0 Comments

Next subject is tank related.
Today I was researching a bit more on pipes, fittings etc.

I have motorised ball valves for inlet and outlet of each tank. I want to make the inlet hoses 25mm for max possible flow although I may not need that too often really when we make the water through the desalinator, nevertheless I use that diameter because I have a few meters of hose I can use for the fresh water tanks. The tank inlet is 20mm.

For the drinking water I will use 19mm because foodgrade hose in 25mm is just too expensive and the […]

Tank Mounts

By |July 20th, 2015|CHASSIS BUILD|0 Comments

Today I had a few hours again outside.
I started to do all the tank mounts ..
the brackets were laser cut and bent and now I need to fit them onto the chassis that nothing moves.
The idea is that everything can be removed from underneath and fitted again if required. So welding is not going to happen because it needs to be removable.

The next best thing is to use rivnuts. Welding, rivnuts, glue, pop rivets and cable ties are the only fastening means I am going to use.
With most if not all caravans the doors, windows, baggage doors and other […]

DirecLink NE

By |July 19th, 2015|CHASSIS BUILD|0 Comments

Half a day today outside, raining again now a bit – on and off.
I have to do some other stuff for the rest of the day. This commercial project I am managing takes a bit more time off my schedule, so did the rain. At the moment I have around 4 weeks delay with my van, but that will not be the end at this stage. I still have to finish the underfloor frames before I can go to QLD but I am not stressing about that.. if it takes a few months longer it is not a drama […]

ABS Leak Fix

By |July 18th, 2015|CHASSIS BUILD|0 Comments

Had an answer from Tuson. Not very satisfactory though ..
I want to see a manufacturer or supplier not trying to shift the blame for something not working as the first part of a response.
How about just looking at the facts and what was said. It is so annoying that people cannot listen and always assume that one does not know what one talks about. Obviously there must be too many idiots they deal with to develop such an attitude.

They simply did not believe that their fittings are leaking. They also did not believe that they all were leaking and […]

ABS Leak

By |July 17th, 2015|CHASSIS BUILD|0 Comments

Have not posted for a while.
Lots of things to do and not just for the van.
A few more bits and pieces arrived, my Ethernet panel connectors, the water proof round panel connectors and a few other things. I now can finish my CAN/Ethernet gateway units and the valve controllers etc.

All the lights are connected and working and I rewired the trailer connectors on my truck with a new socket in the front of tub, closer to the coupling. I also have finished the wiring for the brake controller.

The VIN number is stamped on the chassis and I started to […]

Suzi Coil Cable

By |July 9th, 2015|CHASSIS BUILD|0 Comments

Was great weather again today.
Done some more wiring. The trailer cable connector, brake away switch and the electric over hydraulic actuator.
Above image shows the trailer cable with the 7 pin connector. I use the large metal ones, not the tiny plastic stuff which would not hold the heavy suzicoil. I have two more suzicoils, one for power 12V for the brakes and the trailer battery and one 15pin coil for all the remote control connections.

Tomorrow I have another lengthy business meeting in the morning, but I should be able to finish all wiring in the afternoon.

Tank Brackets

By |July 8th, 2015|CHASSIS BUILD|0 Comments

 

 

 

Also finished were the tank brackets. Perfect fit, just tested some but not all yet.

One of the larger front fresh water tanks and above the smaller center fresh water tank.

Will check the others after the registration. I have to get some rubber lining for the brackets and the will manufacture the locking mechanisms and the guides for the tanks to hold everything in place on rough terrain.

Will finish wiring the trailer cable tomorrow.

I also have arranged for the production of my compliance plates, for the trailer and the coupling. Ready on Monday.
I aim to have the trailer registered some time […]

Name Plate

By |July 8th, 2015|CHASSIS BUILD|0 Comments

Good weather today. Cold but dry and I could do something.
The marker lights are all fitted and partially connected.
Pulled some cables into the rails of the neck and then went and picked up
the latest job from the laser cutters.

The name plates are finished, they go onto the mud flaps. Stain less steel 1mm, price $8.50 a piece.

Tail Lights

By |July 5th, 2015|CHASSIS BUILD|0 Comments

Friday it made some plates to mount the tail lights and the license plate.
I attached them to the trailer and mounted the tail lights and the base for number plate light.
And then it rained again.
Yesterday I was busy with other things and today more rain, but I managed a couple of hours connecting the tail lights and cleaning up around the battery and power distribution box.

Expect the marker lights to come tomorrow and better weather. I have to connect the brake controller in the truck to actually commission the brake system. Will happen this week, next week I want […]

Fuse Box

By |July 2nd, 2015|CHASSIS BUILD|0 Comments

Couple of rainy days. Today I did not work on the van, had other things to attend to.
A few bits and pieces arrived yesterday and today. The tank senders amongst them and some more project boxes. The hole saw from Hong Kong ordered 5 days ago came today.
The marker lights I ordered Sunday and paid express are still not sent and they come from
Melbourne.

Yesterday it was raining a fair bit but I done 2 hours fitting a fuse box for the trailer cable.
I run all my trailer wires over separate fuses to avoid blowing the fuses in the truck. […]

Finished Floor

By |June 27th, 2015|CHASSIS BUILD|0 Comments

The floor is completely finished, the capping is not complete yet.

Have extended and connected the ABS sensor lines.

Left to do:
Fitting of right mud flap
Brake controller in truck.
Wiring the brake actuator.
Filling the brake system and bleeding the ABS controller and the brake callipers.
Fitting and wiring the lights. – I am waiting still on my suzi coil trailer cable.
Stamping the VIN number.
Attaching the compliance plate (after the weigh bridge).

That is all is left to do for the registration. Will make an appointment on Wednesday for the next week.

After that comes some testing and then the finishing of the under floor frame […]