By |August 22nd, 2015|CHASSIS BUILD|0 Comments

I started to put the breather lines in.. I had already mounted some smaller stuff but then decided that I am going to regret a small diameter on the breather when I want to fill the tanks quickly from a high volume source or want to do some transfer pumping.

Making sure they run higher than the breather connections to the tank. Have seen some real bad work on a couple of caravans from a local dealer here where the breather lines run lower at some points and can easily get filled with water and there is no way for […]

Air System – Tidy Up

By |August 22nd, 2015|CHASSIS BUILD|0 Comments

Today we had a few hours good weather and I used it ..
Cleaned up the wiring around the air engine and the components ..

 

the empty ports on the manifold are going to be used for the load share solenoid when
they arrive .. 3/8 hose with compression fitting to the solenoid ..

 

Air System – Operation

By |August 18th, 2015|CHASSIS BUILD|0 Comments

Two images showing the difference in height between low and high.

 

 

The first video shows the lift from lowest position to standard ride height.

the next movie shows the chassis dropping to lowest position.

and the next one shows the lift to highest from lowest. That
was the test when I took the measurements of the final set up.

The top image shows the panel at max height.

At the moment the chassis is very light so the lift is pretty quick. This will take a bit longer when the van is finished.

I could fill a few pages with the pros and cons and […]

Air System Fix

By |August 18th, 2015|CHASSIS BUILD|0 Comments

Have worked on the air system to day and finally got everything fixed an working. Took another effort because there were more leaks right at that air engine.

I fixed the main leak and then there were still small leaks around the flow adjuster screw. I fixed that too and then all was tight, BUT it did not survive the rattle test. That’s when I go over everything and rip at the cables and lines and wiggle and push and shove to see if it holds together. Spay some foamy water on it and wiggle again .. check the pressure […]

Air Leak

By |August 17th, 2015|CHASSIS BUILD|0 Comments

Today I swapped all the useless push in fittings with compression fittings using the same plastic hose. Had to tap 4 fittings with NPT thread at the mechanical pressure gauges. I only had BSP fittings, but it worked fine.

All my new connections were tight right from the start, should have done this in the first place BUT Chinese/American or whoever done that struck again:

The main connection of three of the 4 fill valves leaked where the connection goes into the body of the valve. One would expect that such things get pressure tested.. far from it I guess… This really annoys me […]

Switch Mounting Bracket

By |August 15th, 2015|CHASSIS BUILD|0 Comments

Then today I made a mounting bracket for the some switches next to the pressure gauges. Takes a while when you have only limited tools.

Finished wiring and then started the air system when disaster struck.

The compressor output of the control unit does not have and power although I put a relay on it and not the compressor itself despite instructions that this is possible. I did not trust the cable coming out for 40A and the compressor draws slightly more anyway.  But there is no voltage at all on the wire. Ok, I will have to go through the […]

More Cables

By |August 15th, 2015|CHASSIS BUILD|0 Comments

Some setback today .. damn frustrating, but I come to that later.
Yesterday I had two main tasks, putting more cables in, wiring everything up and finishing all airlines was one and the other was my commercial project. Was in and out of the office, so my time outside was limited.
Anyway .. I got all the wires in and a few were left to connect today.

 

 

Air System – Air Lines

By |August 12th, 2015|CHASSIS BUILD|0 Comments

Started to put in the airlines in. The air engine is connected.

Airbags are connected

The manifolds for each airbag are mounted with all connections and the additional pressure sensors.

A few bits are left and the main air supply line does not fit, will get that fixed tomorrow morning and then I will finish the rest. We expect rain again, so I will get the bits first.

 

 

 

 

 

Air System – Initial Setup

By |August 11th, 2015|CHASSIS BUILD|0 Comments

Good weather, done some work .. still moving data around the computers
couple of terabyte take time to copy .. Ubuntu times out when nas is too busy..
have not had that problem before, but no intention to solve this for now, so
I did not do too much in parallel and left the Linux box do it’s thing..
All data is recovered from the busted raid .. that was another reminder to
keep backups up to date.

Anyway .. I wired the air control unit. Started with the airline but one is wrong ..
I did not double check in the shop and they did […]

Air System

By |August 7th, 2015|CHASSIS BUILD|0 Comments

Not much done today up to now.. just running around getting things organised
I picked up most air parts … they were short 5 fittings .. I took all of their stock ..unbelievable..
So I had to go to another place and they had only 5 but at least drilled out the 5 NPT fittings for me to fit the 10mm pressure sensor. Also got the mounting box for the air control unit, the other one I had  was just too big.

Went by the accountant, picked up some alu and bought two large discs for my NAS because I am running full.
Now […]

Tank Lids And Senders

By |August 6th, 2015|CHASSIS BUILD|0 Comments

Just a quick one, pretty busy …

Other stuff all morning, those other projects having an impact on my schedule ..

Afternoon I done some more plumbing.
Even unpacking takes quite some time .. the rest of the tank inspection openings, the tank senders and  breather filters.

Finished all the inspection lids and the tank senders in the watertanks. Have to do the tank senders in the holding tanks.  Have to source some fittings for the gray and blackwater inlets into the holding tanks. They only have outlets.

Tonight I finally ahve to finish the control unit for the legs, at least the hardware. […]

Air System

By |August 5th, 2015|CHASSIS BUILD|0 Comments

Yesterday I went shopping for some air fittings.
Not all in stock where I usually go. The place is looking run down. I may have to change suppliers I guess. Damn traffic in the afternoon, one looses so much time going to shops.
I much prefer online shopping but sometimes delivery from China is a bit long when you need to get things working. So far I have been pretty good in ordering things in time. Only a few items I was running short, not really a problem.

Yesterday I also extended my levelling leg control unit and tested the CAN bus, but had […]

More ABS Testing

By |August 3rd, 2015|CHASSIS BUILD|0 Comments

Busy day, although I did not do much really, not even my shopping. After adjusting the shocks yesterday I went for another drive. I had around 2.7t weight on it and the bags had 50 psi – empty I had 18psi at the same ride height. I also tested and calibrated the ABS and it works well now, bedded the brakes a bit more with some progressive braking, will do that a bit more though. The workshop manual for my JH7 front brakes requires 20 brake operations with progressive pressure and various speeds. I also tested the trailer by […]

Level Control Unit

By |August 3rd, 2015|CHASSIS BUILD|0 Comments

Finished the prototype of the level control unit late yesterday after some more documentation. The image below now shows all the components, which go in a box tonight. The limiter switch inputs from the legs go through an optocoupler board for input protection of the arduino and a defined, noise free signal. The components are named in the image.

I have extended the software to interpret the limiter switches, which I currently simulate with that orange cable and the wire at the tip.

The rest of the software to be done is some value display of the battery voltage and angle […]

Level Control Unit

By |August 2nd, 2015|CHASSIS BUILD|0 Comments

Made good progress tonight with the levelling system.

The image below shows the main components:
The accelerometer (to the left), the display (16×2), the keypad, the Arduino with CanBus and IO Extender shield and the test output for the relay controls.
I use the led row to verify the signals for the relay outputs to start the legs. In the final box I will have 8 relays, two for each leg (up and down).

Below is an example of the display content during auto level. It shows the status of each leg and the direction of movement.

I have finished the calibration functions, all […]

Air System

By |August 2nd, 2015|CHASSIS BUILD|0 Comments

Done some office work today .. taxes .. not really exciting ..

Had a few hours outside and late afternoon on the computer.
First of all I adjusted my shocks to level 9 (maximum stiffness) from level 5 (medium) and will give it a try with the weight on. Probably a bit too stiff for the current weight, I will see.. More importantly I added some air in the hitch bag to make that a bit stiffer too. Eventually I will fit a shock also onto the hitch. This will reduce possible up and down movement further.

I also had a […]

Putting the Weight On

By |August 1st, 2015|CHASSIS BUILD|0 Comments

Today at a friends place I filled water into the tanks. We don’t have a large enough water tank to waste it, they have huge tanks and we will get some more rain anyway.
The image shows nicely why a goose neck (ball coupling) is so much better than any 5th wheeler.
And that twist was only a small one. The truck is still level but the trailer already on an angle of 7 degrees. I wanted to level the trailer using the levelling system and it said: “Too much angle” and did not do anything … dohhh .. what a rubbish […]

By |July 31st, 2015|CHASSIS BUILD|0 Comments

A bit of a sad thing happened this afternoon, however it was unavoidable and ended
very peacefully.

We had to put our dog down. She deteriorated today very quickly. Was on and off the last weeks but today it was just time. Many signs from here that she was ready to go.

We only had her since a year, the original owner died and the kids wanted to put her down. We had her as a foster dog for a few weeks and arranged to keep her. She was a very special dog and not only to us.

She went very peacefully and quiet. […]

Weight Test

By |July 31st, 2015|CHASSIS BUILD|0 Comments

This morning I picked up my PVC containers, 6 of them.
Yesterday I removed the floor, not going to kill that floor with 1000kg water tanks sitting on it.
I placed some timber beams under the container cradles.

I made some progress yesterday evening with the new control unit for my hydraulic levelling system.  The tilt sensor works very well, much better than the original and I can actually put everything in one box. The original is a control unit and a display/keypad unit connected via a serial cable. I decided to put  everything in one box because for my system it does […]

Inspection

By |July 30th, 2015|CHASSIS BUILD|0 Comments

It is done !
Inspection took place this morning, passed with flying colours.
Now my wife will go to the licensing center and get the number plate.
Tomorrow I will pick up 5 1000l water tanks for my kids and a friend
and I will use 3 of them to load the trailer to the limit when filled with
water. I will fill all 3 tanks to a bit under full, that will give we 2700kg
including the weight of the tanks, which will take me to 4420kg total.
That’s enough for a test on a rough road. I plan to load it to 6t on […]