outriggers_right

Done the hanger for the front grey water tank need a middle brace still. That will come after the registration.

front_gray_water

The brake lines are done and the brake locks are in place.

brake_lock_mounted

Both steps are done

both_steps

and the trailer now stands on it’s own feet at normal ride height. Hardly any air in the bags at this stage with so little weight on them right now.

ride_height

step_height