The First Cut

By |March 25th, 2015|CHASSIS BUILD|0 Comments

Today I adjusted the saw to a perfect 90 degree angle to the blade to make sure that I have very nice right angle cuts. I used one of the machined mounting blocks which I have from my machinist for the trailing arm hanger. These blocks are absolutely perfectly square and ideal for the job.

Having done that I realised that this angle is ok to adjust without additional tools but the other problem is the vertical angle. Over a length of 9m a minimal angle away from a perfect horizontal level will result in a not so perfect vertical […]

Ethernet CAN Bus Gateway

By |March 25th, 2015|CONCEPTS|0 Comments

The TAS has two Ethernet/CAN bus gateways for reason of redundancy. If one fails to respond the second one is activated to take over the message relais function. The gateway simply forwards the CAN bus message sent over Ethernet to the CAN bus client and realais the response back to the sender over Ethernet. I stated at another occasion that I decided to use the CAN bus because of the number of client processors and the fact that Ethernet would require far too many switches (ports) and cables to connect each client. The CAN bus is a real bus […]

Solar Panels Arrived

I added a couple of pages to the website.
One about the 240V system and one about my first cut with a little video of the saw in action.

I have adjusted the saw perfectly square and will get a laser level tomorrow for the vertical adjustment.

The solar panels came today, so now all my components for the 240V system are here, the batteries, inverter/charger,
solar charge controller and flexible solar panels.

The cables on the solar panels are pretty long, I will have to shorten them in groups of 4 because the panels will be rather close and I don’t like the long […]

Receiving components and thoughts

Done lots of things, little stuff but lots. Today I picked up the steel for the trailing arms and the rods to make the jig for the suspension hangers. Will talk about that later .. The trailing arms are made from 65x65x5 C450 galvanised steel (Duragal Plus).
I could get away with 4mm but decided to have more safety margin, I have a 6t rated chassis after all, so the trailing arms should not be the weakest link. I push comes to shove I can fit an air over hydraulic unit instead of the electric over hydraulic unit and go […]

CAN Bus Program

By |March 22nd, 2015|CONCEPTS|0 Comments

This chapter is not really for every one. Maybe a little too technical for the average auto electrician. This is an early version of an Arduino sketch for a network node reading temperature values from digital temperature sensors ($1.80 each) and sending the data to a gateway with Ethernet port to be forwarded to the central processor for processing and display. This is not a programming lesson, but the few who might be interested to see what an Arduino sketch looks like may have something to ponder over. For an IT person this is probably peanuts, since I used […]

CAN Bus

By |March 22nd, 2015|CONCEPTS|0 Comments

All the electric signals in the van are going to be controlled by the TAS and all sensors have to be connected also. The signals and sensors are spread all over the van and it would be rather daunting to connect them all back to the central processor. One reduces the complexity of such an installation by building a network of nodes, which are processors handling local signals and being connected with each other for communication.

I am using Ethernet for some of the connections but with a larger amount of nodes in the network Ethernet is not really the […]

Machined Custom Parts

By |March 22nd, 2015|SETTING UP|0 Comments

Today I picked up all the parts for the running gear which were machined for me by George from J&L Engineering. Great man and very meticulous in his work, unlike some of the trailer places where you get told that 2mm play is good enough for a trailer.

Above pictures shows the mounting blocks with brass bushes, the suspension bolts (1.25″) with grease nipples and lock nuts. These blocks are going to be welded onto the trailing arm and are mounted onto the hanger plate with the bolts. It is a perfect fit, with less the .2mm play, just enough […]

A Van With A Balcony

By |March 21st, 2015|SPECIFICATIONS|0 Comments

After the last visit to the Caravan & Camping show I got some more homework to do. We have seen a caravan with a fold down deck. However it was in the front of the van over the A-frame, which is not really an option for us and it was done in a way I would not want to do it for our van.

The deck looked nice and all detail was well thought through, but there were a couple of aspects, which I would want to do differently. First of all it was too heavy with over 100kg added […]

Optimising Cuts

By |March 13th, 2015|SETTING UP|0 Comments

Cutting a long, custom made beam is a bit like formatting a long used hard drive. You never feel certain that you do the right thing. If a cut goes terribly wrong you are in trouble because the material is not retainable anymore or only at a great loss. So preparing the cuts is as important to me as the cutting itself.

I had done something like this before I actually ordered the material to optimise the beam length for the best price/length ratio. The longer and fewer beams the cheaper the whole lot with the constraint to meet the […]

Laser Cuts – Suspension Mount

By |March 12th, 2015|SETTING UP|0 Comments

Today I picked up the suspension mounts, counter plate and the airbag mount plate.

The pieces above need to be welded on the main mount plate and the little tabs are for location and strength. Everything fits perfect apart from a little mishap.

Something got lost in translation. I missed to specify the different thickness of the material. The counter plate was meant to be done in 6mm and not 8mm like the main mount. Now I am 1mm out with the distance between the proper mount point of the counter plate and the front edge flange of the mount. I […]

By |March 12th, 2015|CHASSIS BUILD|0 Comments

Today I picked up the suspension mount from the laser cutter people.
Cutting, drilling, bending – great work ..
Had a bit of a problem though with one part. Material thickness too high, but i was my fault.
Have written about it here .. Suspension

Also today the CAN bus shields for my Arduinos arrived, so I have a bit work for the night or the next couple of nights.

I am just now finishing the drawings for the coupling mount. Since I am happy with the laser cutter people I will now get
all the remaining parts done. I like it – it is so […]

Test Environment

By |March 11th, 2015|CONCEPTS|0 Comments

Most of my tests have been done on the breadboard or free air connections between boards. This works with a few components on the desk but when it gets to the point that one wants to test any kind of integration between components it becomes difficult to keep an overview and more importantly making sure one does not create shorts or bad connections. I use lab power supplies, which ultimately is not a problem for shorts because the lab supplies handle that nicely by limiting the current or cutting the voltage. Nevertheless a more solid setup was needed.

I had […]

Machined Parts Picked Up

By |March 11th, 2015|CHASSIS BUILD|0 Comments

Picked up all my machined parts today .. here is the write up

Machined Parts

Early next week I will all the laser cut and bent components for the suspension mount and then we can start in ernest to put that thing together.

Security Cameras And Recorder

By |March 10th, 2015|COMPONENT BUILD|0 Comments

Right now I am still waiting for some CAN bus shields and digital temp sensors, but they are expected soon. Yesterday my NVR arrived (Network attached Video Recorder). I did put in an old SATA drive (Will use an SSD in the production version) and the thing was working very well only after a few minutes. The IP camera is great, good image quality and very sensitive in motion detection. The recorder starts automatically with motion detection from any of the connected cameras.

Although I am very happy with the quality of the camera (both built quality and image quality) […]

Lab Testing Electronics

By |March 10th, 2015|COMPONENT BUILD|0 Comments

I was working on the electronics for the TAS (Teutanic Automation System). I have tested most individual signal types on their own and now have mounted all the different board types I am using on a perspex plate to make a bit more solid test environment. I have too many individual pieces to just make it work free air on the desk. Not that I mount all the devices I am using, far from it, but enough of each type to test all the variations of the required control functions. Since we talk automotive electrics/electronics we deal mainly with […]

Cleaning Out Shed

By |March 5th, 2015|SETTING UP|0 Comments

The shed is cleaned up and ready to take the chassis. The next thing I have to do is to make some tressels to keep the chassis off the ground and perfectly level, which the floor of the shed is not.

The band saw is in position to cut the beams.

HVAC Remote Control

By |February 25th, 2015|CONCEPTS|0 Comments

Another step along the way of full automation has been made today. I finished the page for aircondition control with two heads, one in the kitchen/living area and one in the bedroom. The heads can be switched between the two locations and are connected to the same outdoor unit. The right most temperature scales actually control the target temperatur for each headunit by dragging the red bit to the desired temperature. This will be the same concept on the phone remote control.

Each of the headunits run to the desired temperature, if achievable, but the switch over between the two […]

Battery Monitor

By |February 25th, 2015|CONCEPTS|0 Comments

A major component of the van are the battery packs. Lithium technology brought the weight down considerably and increased cycle times and higher discharge levels make the technology quite attractive. There are a few downsides though. One has to be careful with the charging regime not to overcharge and also make sure that each cell (4 in a 12V battery) has the same voltage, meaning the cells are balanced. The battery needs a BMS (Battery Management System) which monitors the cells and will disconnect a charge line or a load line in case of over charge or over discharge.

It […]

Security IP-Camera

By |February 18th, 2015|CONCEPTS|0 Comments

Today my IP-Camera arrived from China via DHL. It took only 5 days from time of order. Wrapped 3 times in bubblewrap and lots of tape inside a DHL bag. Very nice product, software and documentation on CD and additional software through web download. Was easy to set up. Just change ip of one pc to the default network of the camera, login with browser and default user/password, change ip to local subnet, reboot the camera and the live stream was visible in the browser window after downloading the plugin from their website. All took less than 15 minutes. […]

Testing Motorbike Carrier

By |February 14th, 2015|SETTING UP|0 Comments

Originally I had the motorbike on a carrier at the end of the van as most people would think, however there are a few good reasons against it. We have a goose neck trailer so the stability issue is not really as pressing as on a caravan with a larger load at the end. Nevertheless

I wanted to save a s much weight on the van as I could because the weight limits are more critical on the van than on the truck. I have a bit more margin on the truck. So the plan is now to hang the […]