Level control box is almost done ..
All the components are in the box and it is still working Need a few more wires and the connectors need to go in. The USB panel connector is in, so I can still update the software
without opening the box.
The front plate. I was a bit impatient so the cut out was not perfect, but good enough for now.
Late now, so I will finish Wednesday. Later today I have other things to do. Anyway .. not too far away anymore from replacing the Bigfoot unit.
Add Comment
You must be logged in to post a comment.